Laserfiche WebLink
CHANGE ORDER # <br />Project (Procurement) Number: Small Works Roster Project Title: <br />IFQ 2024-113 Clark Park Renovation and Off-Leash Dog Area <br />Description of Change: (Attach contractor change proposal and cost schedule) (Attach Price or Cost Analysis) <br />BUILDING/LOCATION: 2400 Lombard Avenue, Everett, WA 98201 <br />This change order increases the total project price by ordering and installing different light poles than what was <br />originally specified in the solicitation. <br />The original light poles specified were motion-sensored, with lighting decreasing if no motion was detected. After <br />the contract award, the noticed that the solicited light poles were not uniform with the installed <br />light poles in downtown Everett. The newly specified, change order light poles will not have motion sensor controls <br />and will instead constantly emit light. Having uniform light poles throughout the city will allow city employees to <br />maintain and repair them with minimal training. Additionally, the city will be able to keep a lower stock of <br />replacement parts on hand that can be used on these types of light poles. <br />The project manager coordinated with the awarded contractor to identify and order the correct light poles. <br />The changes described above result in the following adjustment(s) in price and contract time (in calendar days). <br />* Total Project Price Prior to this Change, <br />including tax $377,522.99 Contract Time & Completion Date Prior <br />to This Change 180 <br />Completion Date <br />Prior <br />05/18/25 <br />* Net (Increase) or (Decrease) Resulting from <br />this Change, including tax +$29,153.30 Net (Increase) or (Decrease) Resulting <br />from this Change 0 <br />* Total Project Price Including this Change, <br />including tax $406,676.29 Contract Time & Completion Date <br />Including This Change 180 <br />Completion Date <br />After <br />05/18/25 <br />By signing below, City of Everett and the Contractor agree that the Contract work shall be changed to the extent described in <br />all such <br />changes, including all direct and indirect costs and impacts. The City of Everett and the Contractor further agree that <br />Contract time shall be adjusted to the extent shown above. This Change Order only changes the contract between City of <br />Everett and the Contractor to the extent explicitly provided in this Change Order. Signatures on this change order may be ink, <br />scanned pdf signature, or other electronic means (such as AdobeSign). <br />CONTRACTOR CITY OF EVERETT <br />Reaper Construction, Inc. <br />17903 29th Avenue NE <br />Marysville, WA 98271 <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 Date <br />Project Manager: <br />Division Manager: <br />Department Director: <br />Name & Title:Raine Smiley, President City Attorney Template Approved as to Form 7.14.23 <br />Date:Mayor:Cassie Franklin <br />*WA Use Tax on materials included. WAC 458-20-171 <br />Attest: ___________________________ <br />Office of the City Clerk <br />0002 <br />Raine Smiley <br />02/04/2025 02/10/2025