<br /> <br />CHANGE ORDER # <br /> <br />Project (Procurement) Number: Small Works Roster Project Title: <br />IFQ 2024-115 Kiwanis Park Electrical <br />Description of Change: (Attach contractor’s change proposal and cost schedule) (Attach Price or Cost Analysis) <br />BUILDING/LOCATION: 3600 Rockefeller Avenue, Everett, WA 98201 <br />This change order increases the total project price and extends the contract timeline by 93 days to allow for the <br />ordering and installing of a different light pole than what was originally called out in the solicitation. <br />The original light pole specified in the solicitation was motion-censored, with lighting decreasing if no motion was <br />detected. After the contract award, the neighborhood residents provided feedback to the city, stating that a <br />motion-censored light would be disruptive to the community and that they preferred a constant light source. The <br />project manager further consulted with the neighborhood residents and concluded that the new light pole should <br />match the existing light poles in the park. The new light pole’s lead time is about 14 weeks, requiring the city to <br />extend the contract timeline to accommodate the change. <br />The changes described above result in the following adjustment(s) in price and contract time (in calendar days). <br />* Total Project Price Prior to this Change, <br />including tax $31,796.27 Contract Time & Completion Date Prior <br />to This Change 90 <br />Completion Date <br />Prior <br />03/29/25 <br />* Net (Increase) or (Decrease) Resulting from <br />this Change, including tax +$10,678.98 Net (Increase) or (Decrease) Resulting <br />from this Change 93 <br />* Total Project Price Including this Change, <br />including tax $42,475.25 Contract Time & Completion Date <br />Including This Change 183 <br />Completion Date <br />After <br />06/30/25 <br />By signing below, City of Everett and the Contractor agree that the Contract work shall be changed to the extent described in <br />the above “Description of Change” and that the compensation shown above represents complete compensation for all such <br />changes, including all direct and indirect costs and impacts. The City of Everett and the Contractor further agree that Contract <br />time shall be adjusted to the extent shown above. This Change Order only changes the contract between City of Everett and <br />the Contractor to the extent explicitly provided in this Change Order. Signatures on this change order may be ink, scanned pdf <br />signature, or other electronic means (such as AdobeSign). <br />CONTRACTOR CITY OF EVERETT <br />Dickson Electric LLC <br />5815 163rd Avenue SE <br />Snohomish, WA 98290 <br /> City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 Date <br /> <br />Project Manager: <br />Division Manager: <br /> <br /> Department Director: <br />Name & Title: Kurt Dickson, Owner City Attorney Template Approved as to Form 7.14.23 <br />Date: <br /> Mayor: <br /> <br />* WA Use Tax on materials included. WAC 458-20-171 <br /> <br />Attest: ___________________________ <br />Office of the City Clerk <br /> <br /> <br />0001 <br />Lolly Huggins 01/24/2025 <br />01/24/2025 <br />02/04/2025 <br />Kurt Dickson <br />02/04/2025 02/10/2025