My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell 2/16/2025 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell 2/16/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2025 3:58:27 PM
Creation date
2/19/2025 3:58:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell
Approval Date
2/16/2025
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Jeff Mars
Subject / Project Title
WFP eOM SharePoint Site & AM/Maintence Program Support
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004299
Total Compensation
$274,876.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell 4/16/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett AM Quick Wins and T&D eOM SharePoint | Scope of Work <br />5 <br />DRAFT_Quick Wins and TD eOM <br />•Finalize development and submittal of Asset Data Framework based on items discussed and <br />confirmed during the workshops. <br />Task 504 – Asset Data Framework Enhancement Development <br />Objective: The objective of this subtask is to apply the asset data framework enhancements that <br />have been defined in the previous tasks (Task 501- 503) to the current City data. This would be a <br />collaborative task with the City’s GIS Manager and Cityworks Administrator. <br />Activities/Approach: This task includes the following activities: <br />•Conduct review meeting to confirm Asset Data Framework developed in Tasks 501 – 503. <br />•Coordinate with City GIS/CMMS Administrators on the modifications that are defined in Tasks <br />501-503. <br />•Test and confirm the modifications to the asset data framework. <br />Task Assumptions <br />•Asset Data Framework review meeting will be scheduled for up to 2-hrs and be attended by up to <br />3 BC Team members. The meeting will be virtual. <br />Everett Responsibilities <br />•Coordination/Collaboration on the modifications that will be required to the current asset data <br />framework. <br />•Conduct the necessary enhancements within GIS to the Data Framework as defined in Task 501 <br />– 503. <br />Meetings <br />•Asset Data Framework Review Meeting <br />•As needed coordination and collaboration meetings. <br />Phase 510 – Pilot Data Collection <br />The objective of this subtask is to conduct a pilot collection effort within both the WFP and WPCF to <br />inventory assets for entry into the asset inventory. <br />Task 511 – Preparation Data Coordination <br />Objective: Coordinate with the City on which assets will be collected at both the treatment plants and <br />determine how the data will be accessed for the pilot collection. <br />Activities/Approach: This task includes the following activities: <br />•Confirm asset data framework updates noted in Task 504 have been addressed and will meet <br />the requirements of the pilot data collection. <br />•Review existing drawings to understand assets/asset locations within the facilities. <br />•Coordinate with the City on the georectification of the drawings to the plant locations. These <br />georectified drawings will be used to support the spatial capture of the equipment. <br />•Coordinate with the City on which data to collect. With the collection occurring at both the WFP <br />and WPCF, the team will want to collect a range of mechanical, electrical, structural and I&C <br />assets within different process groups within the plants. <br />•Coordinate/Collaborate with GIS Manager and Cityworks Administrator
The URL can be used to link to this page
Your browser does not support the video tag.