My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/02/19 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/02/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 10:48:13 AM
Creation date
2/20/2025 10:45:34 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/19/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: An Ordinance creating a special improvement project entitled “WPCF Headworks <br />Replacement” Fund 336, Program 046. <br />Council Bill # interoffice use <br />CB 2502-13 <br />Project: WPCF Headworks Replacement <br />Partner/Supplier: N/A <br /> Location: Water Pollution Control Facility (WPCF) <br />Preceding action: None <br />Fund: 336 - Water & Sewer System Improvements Fund <br />Agenda dates requested: <br /> <br />Briefing <br />1st Reading 02/19/25 <br />2nd Reading 02/26/25 <br />Action 03/05/25 <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Proposed Ordinance <br /> <br />Department(s) involved: <br />Public Works, Admin <br /> <br />Contact person: <br />Jeff Marrs <br /> <br />Phone number: <br />425-257-8967 <br /> <br />Email: <br />jmarrs@everettwa.gov <br />Initialed by: <br /> RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The funding source for this project will be Fund 401 Water and Sewer Utility Fund. <br />The programmed available funding for engineering assessment and design of this project is <br />$10,000,000. <br /> <br />Project summary statement: <br />The headworks structure at the Water Pollution Control Facility (WPCF) is a key piece of <br />wastewater treatment infrastructure. It was constructed in 1983-1984 and has been upgraded <br />and repaired many times since. The headworks structure needs complete replacement due to <br />ongoing and increasing internal structural degradation and process equipment deterioration. <br />Risks of replacement delay include City personnel injury, catastrophic process equipment failure, <br />and costly short-term repairs. <br />Headworks replacement is being implemented in two phases, engineering assessment and design <br />and construction. The estimated cost for the engineering assessment and design phase of this <br />project is $10,000,000. <br />Council approval of this ordinance will provide funding for engineering assessment and design <br />tasks. Public Works will return with a subsequent funding ordinance amendment request when <br />project design is substantially complete and detailed construction cost estimates are available. <br /> <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a Special Improvement Project entitled “WPCF Headworks <br />Replacement” Fund 336, Program 046. <br /> <br />City Council Agenda Item Cover Sheet
The URL can be used to link to this page
Your browser does not support the video tag.