My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 SE EVERETT MALL WAY 2025-04-21
>
Address Records
>
SE EVERETT MALL WAY
>
405
>
405 SE EVERETT MALL WAY 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 8:27:28 AM
Creation date
2/21/2025 8:19:46 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
405
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> Element 12. Manage the Project: <br /> IR BMP C150: Materials On Hand <br /> ❑ BMPC160:CertifiedErosionandSedimentControlLead <br /> (CESCL not required on-site for sites<lacre) <br /> ❑ BMP C162:Scheduling <br /> ❑ Other PertheSWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 13. Protect low impact development: <br /> ❑ BMP C102: BufferZones <br /> ❑ BMP C103: High Visibility Plastic or Metal Fence <br /> ❑ BMP C200: Interceptor Dike and Swale <br /> ❑ BMP C207: CheckDarns <br /> ❑ BMP C208:Triangular Silt Dike(Geotextile Encased Check Dam) <br /> ❑ BMP C231: Brush Barrier <br /> lil BMP C233 Silt Fence <br /> ❑ BMP C 234:Vegetated Strip <br /> ❑ Other PertheSWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> 0 Task 3: Construction SWPPP drawings <br /> Provide a Temporary Erosion and Sediment Control (TESC) plan for your project. <br /> LI Show on yourTESC Plan all BMPs selected above to satisfy the 13 Elements on your <br /> TESC Plan. <br /> Ill See City of Everett Public Works Standard Plan 103-TESC Plan Example <br /> everettwa.gov/DocumentCenter/View/7040 <br /> Note:Construction StormwaterPollution Prevention Plans(Construction SWPPPs)that <br /> involve engineering calculations must be prepared by or under the direction of a <br /> Washington State professional licensed engineer. <br /> City of Everett Public Works <br /> Construction Stormwater Pollution Prevention Plan 6 of 6 <br /> (SWPPP) Template for Small Projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.