Laserfiche WebLink
• • <br /> September 3,2021 <br /> 2020141.35 <br /> GPD GROUP <br /> Professional Corporation City of Everett Permit Services <br /> 3200 Cedar Street, 2nd Floor <br /> Everett.WA 98201 <br /> RE: Tesla Electric Vehicle Charging Station <br /> 405 SE Everett Mall Way <br /> Everett, WA 98201 <br /> To whom it may concern, <br /> Our office, GPD Group, Professional Corporation, is the engineering firm handling the permitting process <br /> for the Tesla electric vehicle charging station located at the existing parking lot for the address listed <br /> above. The proposed EV station is to be installed on the southeast side of the parking area and will <br /> include the installation of 1 utility transformer, 1 step-down transformer with integrated sub-panel, 1 <br /> switchgear assembly with integrated master controller, 3 V3 Supercharger cabinets, 2 dual-port level 2 <br /> charge posts, and 12 V3 charging posts. <br /> Please find attached applications for a City of Everett Building Permit as well as a City of Everett Public <br /> Works Permit. Also included in the package are the requested 2 sets of plans to accompany the building <br /> permit application and 4 sets of plans to accompany the public works permit. <br /> The General Contractor and Electrical Contractor have not been selected at this point but that <br /> information will be provided prior to the issuance of the permits. A separate electrical permit will also be <br /> applied for by the electrical contractor once one is selected. <br /> If you have any questions or concerns with our submittal, please contact me by phone at 330-572-3575 <br /> or by email at gpdchargepermits@gpdgroup.com. <br /> Sincerely, <br /> GPD Group <br /> la-vv REA44, 1, <br /> Ian Russell <br /> Planning Specialist <br /> 520 South Main Street, Suite 2531 I Akron, OH 44311 1330.572.2100 I gpdgroup.com <br />