Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> PERMIT EXTENSION <br /> 6/4/2024 6/4/2024 (REASON CINDY BERGSMA APPROVAL SEE NOTES <br /> REQUIRED) <br /> Notes: <br /> Cindy,We are looking to have public works part of this building checked off,IE the outside concrete paving and rail extension. <br /> The procurement of the new door for the building took longer than we were hoping so we need and extension of the permit. <br /> Thank you. <br /> K.C.Wade <br /> Superintendent <br /> Skanska USA Building Inc. <br /> 221 Yale Avenue North <br /> Suite 400 <br /> Seattle,WA 98109,United States <br /> Phone+1 206 496 4699 <br /> Skanska USA <br /> usa.skanska.com <br /> Connect With Us:Blog I Facebook Twitter Linkedln Instagram YouTube <br /> 6/5/2024 6/5/2024 PW 17-CONCRETE JIM KNAPPERT PARTIAL eTRAKiT Inspection Request <br /> PAVING FINAL APPROVAL <br /> Notes: <br /> 6/4/2024 10:39 AM SKANSKA USA BUILDING INC <br /> Contact Name:SKANSKA USA BUILDING INC <br /> Site Address:3003 W CASINO RD BLDG 40-SS <br /> Phone:2063486361 <br /> e-Mail:Ben.neyens@skanska.com <br /> poured concrete where tracks were extended. <br /> PW 25-SITE APPRVD-PERMIT <br /> 10/11/2024 10/11/2024 FINAL/PERMIT JIM KNAPPERT FINAL eTRAKiT Inspection Request <br /> CLOSE OUT <br /> Notes: <br /> 10/8/2024 12:54 PM SKANSKA USA BUILDING INC <br /> Contact Name:SKANSKA USA BUILDING INC <br /> Site Address:3003 W CASINO RD BLDG 40-55 <br /> Phone:4259615692 <br /> e-Mail:Kevin.tucker@SKANSKA.COM <br /> I <br /> Printed: Monday, 14 October,2024 2 of 2 rk <br /> SUPERION <br />