Laserfiche WebLink
Element 3. Control flow rates: <br /> ❑ BMP C203:Water Bars <br /> ❑ BMP C240:Sediment Trap <br /> ❑ BMP C241:Temporary Sediment Pond <br /> LI Other Per the SWMMWW: _ <br /> a Not applicable to my proposed project <br /> Explain: This project is flow control exempt <br /> Element 4. Install sediment controls: <br /> ❑ BMP C231: Brush Barrier <br /> ❑ BMP C232:Gravel Filter Berm <br /> ❑ BMP C233:Silt Fence <br /> ❑ BMP C234:Vegetated Strip <br /> ❑ BMP C235:Wattles <br /> ❑ BMP C240:Sediment Trap <br /> ❑ BMP C241:Temporary Sediment Pond <br /> ❑ Other Per the SWMMWW: <br /> E7 Not applicable to my proposed project <br /> Explain: <br /> Element 5. Stabilize soils: <br /> ❑ BMP C120:Temporary and Permanent Seeding <br /> ❑ BMP C121:Mulching <br /> ❑ BMP C122:Nets and Blankets <br /> ❑ BMP C123:Plastic Covering <br /> ❑ BMP C124:Sodding <br /> ❑ BMP C125:Topsoiling/Composting <br /> ❑ BMP C126: Polyacrylamide for Soil Erosion Protection <br /> ❑ BMP C130:Surface Roughening <br /> ❑ BMP C131:Gradient Terraces <br /> ❑ Other Per the SWMMWW: <br /> I■P Not applicable to my proposed project <br /> Explain: This project only includes new and replaced hard surfaces <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 9 <br />