Laserfiche WebLink
A <br /> • • <br /> Boeing Everett Bldg.40-31 Date: 05/01/2023 <br /> FDesignM Engineering PRAT Tool Foundation <br /> I I I 1 I I <br /> Schedule of Footing Dimensions and Reinforcement <br /> Reinforcement Mark Width Length Depth I Reinforcement <br /> Location B L T Bar Size Spacing notes <br /> (ft) (ft) (inches) (inches o/c) <br /> Top Layer 8.30 27.00 43.50 7 7 each way <br /> Bottom Layer 8.30 27.00 43.50 7 7 each way <br /> Page 4 <br /> a � 8 <br />