My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-31 2025-04-11
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-31
>
3003 W CASINO RD BLDG 40-31 2025-04-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 3:45:01 PM
Creation date
2/21/2025 11:27:48 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-31
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REINFORCING STEEL OBSERVATIONS REPORT rerracon <br /> Report Number: M7231375.0003 <br /> Service Date: 09/18/23 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 09/20/23 Lynnwood,WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> The Boeing Company Boeing Everett Bldg 40-31 Prit Prat Relocation <br /> Attn: David Duffy 3003 W Casino Rd <br /> 3003 W Casino Rd Everett,WA <br /> Everett,WA 98204-1910 <br /> Project Number: M7231375 <br /> Permit No.: B2305-038 (Foundation-Relocation) <br /> GENERAL INFORMATION <br /> On site for reinforcing steel observation of the (4) isolated mat foundation footings. <br /> The construction documents referenced for this observation include the approved structural drawings dated <br /> 01/20/23. <br /> REINFORCING STEEL <br /> Observed the reinforcing steel as detailed below: <br /> Element Location Details/Notes Status Comments <br /> Mat footings Grid lines 11.5 and 12.5 and S563, 1 S563-1 R, 1 S563-2 Reinforcing Inspection of anchor bolts to <br /> between Ba and Bc and 1S563-3 complete follow when installed. <br /> The results of observation(s) for today were reported to Mike with Washington Patriot. <br /> COMPLIANCE STATEMENT <br /> Based on our observations and testing, the above noted items appear to be in general accordance with the <br /> project documents. <br /> Services: Special Inspections/Materials Testing <br /> Mayes/Terracon Rep.: Todd Wirtz <br /> Reported To: Washington Patriot Construction <br /> Contractor: Washington Patriot Construction <br /> Report Distribution: <br /> (1)The Boeing Company,David Duffy (1)Mayes Testing Engineers,Inc, <br /> Donna Pollard <br /> (1)Mayes Testing Engineers,Inc, Reviewed By: <br /> Todd Wirtz _ <br /> 4q-'a7rTuttle <br /> Project Field Manager <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client <br /> indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br /> the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> CT0001,10-16-13,Rev.10 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.