Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 10/15/2021 10/15/2021 ELEC 06-ROUGH IN TODD JOHNS PARTIAL <br /> APPROVAL <br /> Notes: <br /> 425-346-4209 Robert Davenport <br /> (10/15/2021 2:13 PM T110) <br /> Approved rough in on upper floor lower floor issues still to be addressed <br /> Gfci in basement <br /> Seal unused openings <br /> add ground rod <br /> Afci/gfci at final <br /> 10/21/2021 10/21/2021 ELEC06-ROUGH IN TODD JOHNS APPROVAL <br /> Notes: <br /> 425-346-4209 Robert Davenport <br /> (10/21/2021 1:10 PM TJJO) <br /> Approval of rough in <br /> 10/21/2021 10/21/2021 ELEC 02-GROUND TODD JOHNS APPROVAL <br /> WORK <br /> Notes: <br /> Conduit to shop tie in with existing <br /> 11/2/2021 11/2/2021 ELEC 06-ROUGH IN I TODD JOHNS APPROVAL as noted <br /> Notes: <br /> 11/1/2021 8:17 AM DAVENPORT ELECTRICAL CONTR INC <br /> Contact Name:DAVENPORT ELECTRICAL CONTR INC <br /> Site Address:2429 MELVIN AVE <br /> Phone:4253464209 <br /> e-Mail:RRD0660@AOL.COM <br /> (11/2/2021 9:27 AM TJJO) <br /> Building inspector required heater removed from attic space,heater and nm cable moved to basement <br /> I <br /> Printed:Tuesday,07 March,2023 2 of 4 <br /> SUPERION <br />