My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 LAUREL DR 2025-03-31
>
Address Records
>
LAUREL DR
>
505
>
505 LAUREL DR 2025-03-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 11:16:37 AM
Creation date
2/24/2025 9:55:32 AM
Metadata
Fields
Template:
Address Document
Street Name
LAUREL DR
Street Number
505
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 5/5/2022 5/5/2022 BLDG 08-FRAMING KURT KECK APPROVAL as noted <br /> Notes: <br /> 5/4/2022 1:50 PM MALONE CONSTRUCTION LLC <br /> Contact Name:MALONE CONSTRUCTION LLC <br /> Site Address:505 LAUREL DR <br /> Phone:2068613657 <br /> e-Mail:DAVE@BCMGSERVICES.COM <br /> (5/5/2022 2:19 PM KMK) <br /> Please work with your electrical inspector regarding the area around the panel.Leave this area until his inspections are completed. <br /> 5/17/2022 5/1 INSULATION7/2022 BLDG 1I KURT KECK APPROVAL <br /> Notes: <br /> 5/16/2022 11:29 AM MALONE CONSTRUCTION LLC <br /> Contact Name:MALONE CONSTRUCTION LLC <br /> Site Address:505 LAUREL DR <br /> Phone:2068613657 <br /> e-Mail:DAVE@BCMGSERVICES.COM <br /> (5/17/2022 2:12 PM KMK) <br /> OK to sheet rock mud and tape <br /> 11/18/2022 11/18/2022 BLDG 16-FINAL KURT KECK PARTIAL ok TCO <br /> APPROVAL <br /> Notes: <br /> DAVE@BCMGSERVICES.COM <br /> 206-818-3012 <br /> Ok TCO.(Temporary certificate of occupancy)Reschedule for building final when exterior work is completed <br /> I <br /> Printed: Monday, 24 February,2025 2 of 2 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.