My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2420 39TH ST DISH WIRELESS 2025-04-22
>
Address Records
>
39TH ST
>
2420
>
DISH WIRELESS
>
2420 39TH ST DISH WIRELESS 2025-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 2:09:38 PM
Creation date
2/26/2025 9:55:37 AM
Metadata
Fields
Template:
Address Document
Street Name
39TH ST
Street Number
2420
Tenant Name
DISH WIRELESS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g\ 9A20 ,Cr, <br /> CROWN <br /> Date: March 08,2022 V CASTLE <br /> Crown Castle <br /> 2000 Corporate Drive <br /> Canonsburg, PA 15317 <br /> (724)416-2000 <br /> Subject: Structural Analysis Report <br /> Carrier Designation: DISH Network Co-Locate <br /> Site Number: SESEA00105B <br /> Crown Castle Designation: BU Number: 815285 <br /> Site Name: LOWELL <br /> JDE Job Number: 707871 <br /> Work Order Number: 2084453 <br /> Order Number: 607190 Rev. 1 <br /> Engineering Firm Designation: Crown Castle Project Number: 2084453 <br /> Site Data: 2408 39th St., EVERETT,Snohomish County,WA <br /> Latitude 47°57'56.28", Longitude-122°11'44.25" <br /> 130 Foot-Monopole Tower <br /> Crown Castle is pleased to submit this"Structural Analysis Report"to determine the structural integrity of the <br /> above-mentioned tower. <br /> The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we <br /> have determined the tower stress level for the structure and foundation, under the following load case,to be: <br /> LC7: Proposed Equipment Configuration Sufficient Capacity <br /> This analysis has been performed in accordance with the 2018 Washington State Building Code(2018 IBC) <br /> based upon an ultimate 3-second gust wind speed of 98 mph.Applicable Standard references and design <br /> criteria are listed in Section 2-Analysis Criteria. <br /> Structural analysis prepared by:Abigail Ruiz 03/08/22 <br /> Respectfully submitted by: <br /> 013c LAc <br /> ov WAS44. <br /> y� °� <br /> Truc Lac, P.E., S.E. N w <br /> Senior Project Engineer '� 262 ,`�� w4 <br /> r" SION:LAY <br /> aeUE <br /> License Expires: 02/24/2023 <br /> JUL 2 8 2022 I) <br /> L <br /> CITY OF EVERETT <br /> Permit Services <br /> tnxTower Report-version 8.1.1.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.