Laserfiche WebLink
March 08, 2022 <br /> 130 Ft Monopole Tower Structural Analysis CCI BU No 815285 <br /> Project Number 2084453, Order 607190, Revision 1 Page 3 <br /> 1) INTRODUCTION <br /> This tower is a 130 ft Monopole tower designed by ROHN. <br /> 2)ANALYSIS CRITERIA <br /> TIA-222 Revision: TIA-222-H <br /> Risk Category: II <br /> Wind Speed: 98 mph <br /> Exposure Category: C <br /> Topographic Factor: 1 <br /> Ice Thickness: 1 in <br /> Wind Speed with Ice: 30 mph <br /> Seismic Ss: 1.250 <br /> Seismic S1: 0.443 <br /> Service Wind Speed: 60 mph <br /> Table 1 - Proposed Equipment Configuration <br /> Center Number Number Feed <br /> Mounting Line of Antenna Antenna Model of Feed Line <br /> Level (ft) Elevation Antennas Manufacturer Lines Size (in) <br /> (ft) <br /> 3 fujitsu TA08025-B604 <br /> 3 fujitsu TA08025-B605 <br /> 119.0 119.0 I 3 I jma wireless IMX08FRO665-21 w/Mount Pipe 1 1-1/2 <br /> I 1 raycap RDIDC-9181-PF-48 <br /> P 1 1 tower mounts Commscope MC-PK8-DSH <br /> Table 2 - Other Considered Equipment <br /> Center Number Number Feed <br /> Mounting Line of Antenna Antenna Model of Feed Line <br /> Level (ft) Elevation Antennas Manufacturer Lines Size (in) <br /> (ft) <br /> 102.0 3 nokia AEQK <br /> 3 alcatel lucent B25 RRH4x30-4R <br /> 3 alcatel lucent B66A RRH4X45 <br /> 3 alcatel lucent RRH4x25-B30 12 7/8 <br /> 100.0 3 commscope NNH4-65C-R6-HG 6 1-5/8 <br /> 99.0 3 nokia AHCA_CCIV3 4 3/8 <br /> 3 nokia AHLBBA_CCIV2 3 Conduit <br /> 3 raycap DC6-48-60-18-8F <br /> 3 kathrein 80010966 99.0 <br /> 1 tower mounts Platform Mount[LP 302-1] <br /> 3 I andrew E15S08P78 <br /> 87.0 3 andrew TMBXX-6516-A2M <br /> w/Mount Pipe <br /> 3 nokia AHLOA 12 7/8 <br /> 86.0 86.0 1 tower mounts T-Arm Mount [TA 602-3_KCKR] 1 1-3/8 <br /> I 3 I commscope FFHH-65C-R3 w/Mount Pipe <br /> 85.0 2 commscope HCS 2.0 <br /> 3 I nokia I AEHC w/Mount Pipe <br /> tnxTower Report-version 8.1.1.0 <br />