Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 7/10/2023 7/10/2023 BLDG 16-FINAL I RAKEEB KHAN NO ACCESS eTRAKiT Inspection Request <br /> Notes: <br /> 7/7/2023 1:29 PM Dakota Stieler <br /> Questions regarding site access or build info call Dave. <br /> Contact Name:Dave Cotner <br /> Site Address:2420 39TH ST <br /> Phone:3608780439 <br /> e-Mail:dstieler@pnwtowers.com <br /> No Access. Please reschedule online when access is available.To speak with an Inspector to get an ETA or to provide access instructions please call 425- <br /> 257-8810 option 4 between 730a.m.and 830a.m.the morning of your scheduled inspection.10:35 am.Called contact number provided and left <br /> voicemail. No one on site.No plans.Unable to inspect. Public works permit final approval is required prior to final on building permit.Note if any <br /> electrical work requires an electrical permit. <br /> 7/18/2023 7/18/2023 BLDG 16-FINAL RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 7/12/2023 12:55 PM Dakota Stieler <br /> If you have questions regarding site access call Nicole.Gate code:7011 Cabinet combo:2023 <br /> Contact Name:Nicole Sobania <br /> Site Address:2420 39TH ST <br /> Phone:5093044933 <br /> e-Mail:dakotastieler@gmail.com <br /> No plans on site.Unable to inspect without the plans.Contact stated platform support was poured but no inspections for a platform are shown in the <br /> inspection history. Public works permit final approval is required prior to building final. <br /> 8/4/2023 8/4/2023 BLDG 16-FINAL RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 8/2/2023 12:33 PM Dakota Stieler <br /> If you have questions regarding site access call Nicole.Gate code:7011 Cabinet combo:2023 <br /> Contact Name:Nicole Sobania <br /> Site Address:2420 39TH ST <br /> Phone:5093044933 <br /> e-Mail:dstieler@pnwtowers.com <br /> Need Public Works permit final approval prior to building final. Inspected from the ground.See attached special inspection report regarding slab and <br /> anchors. Note that anchors that were tested appear to be for another project. Reschedule final inspection after public works final to receive final <br /> approval. <br /> 8/9/2023 8/9/2023 BLDG 16-FINAL RAKEEB KHAN APPRVD-PERMIT as noted <br /> FINAL <br /> Notes: <br /> PW PERMIT FINALED ON 8/7/2023 <br /> Approved plans not on site.Verified with office set.See attachments regarding special inspections.Slab platform poured without building inspection.H- <br /> frame foundation not verified.Ok to close out. <br /> 8/9/2023 8/9/2023 SPECIAL RAKEEB KHAN ACCEPTED <br /> INSPECTION <br /> Notes: <br /> I <br /> Printed:Wednesday, 26 February, 2025 2 of 3 <br /> SUPERION <br />