My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1200 INDUSTRY ST 2025-03-24
>
Address Records
>
INDUSTRY ST
>
1200
>
1200 INDUSTRY ST 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 11:30:51 AM
Creation date
2/26/2025 11:54:49 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. E-mail:jtaylor@mantisinnovation.com <br /> 1.05 PROCUREMENT TIMETABLE <br /> A. RFP Documents Available: Bid Documents Release <br /> B. Pre-Bid Site Tour : January 9, 2024 at 8AM at 1200 Industry St, Everett, WA 98203. <br /> C. Last Request for Substitution Due: 3 days prior to due date of bids. <br /> D. Last Request for Information Due: 3 days prior to due date of bids. <br /> E. Bid Due Date: January 26, 2024, before 4 PM local time. <br /> F. Bid Opening: Same day, 5 PM local time. <br /> G. Notice of Award: TBD. <br /> H. Bids May Not Be Withdrawn Until: 30 days after due date. <br /> I. Contract Time: TBD. <br /> J. Desired Construction Start: Not later than TBD calendar days after Notice of Award. <br /> K. The Owner reserves the right to change the schedule or terminate the entire procurement <br /> process at any time. <br /> 1.06 PROCUREMENT DOCUMENTS <br /> A. Availability of Documents: Complete sets of procurement documents, including <br /> Owner/Contractor Contract may be obtained: <br /> 1. From Owner at the Designer's address listed above. <br /> 2. Request at the following address:jtaylor@mantisinnovation.com <br /> 1.07 SIGNATURE <br /> Company: <br /> Address: <br /> City: <br /> State: <br /> Zip: <br /> By: <br /> Signed: <br /> (Authorized signing officer) <br /> PART 2 PRODUCTS (NOT USED) <br /> PART 3 EXECUTION (NOT USED) <br /> END OF SECTION 00 0102 <br /> SEA00511 / Prologis - SEA00511 00 0102 -4 Project Information <br /> - FY24- Everett 1 - Capital <br /> Roofing Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.