Laserfiche WebLink
B. Inspection firm will identify the exact limits to material removal. <br /> C. Testing will identify the condition of existing materials and their reuse, repair, or removal. <br /> D. Test Reports: Indicate existing insulation moisture content and existing bitumen quality. <br /> 3.06 PROTECTION <br /> A. Provide protection of existing roofing system that is not having work performed on it. <br /> B. Provide temporary protective sheeting over uncovered deck surfaces. <br /> C. Turn sheeting up and over parapets and curbing. Retain sheeting in position with weights. <br /> D. Provide for surface drainage from sheeting to existing drainage facilities. <br /> E. Do not permit traffic over unprotected or repaired deck surface. <br /> END OF SECTION 07 0150 <br /> SEA00511 / Prologis - SEA00511 07 0150 -4 Preparation for Re-Roofing <br /> - FY24- Everett 1 - Capital <br /> Roofing Project <br />