My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
524 75TH ST SE 2025-03-26
>
Address Records
>
75TH ST SE
>
524
>
524 75TH ST SE 2025-03-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2025 8:11:50 AM
Creation date
2/27/2025 10:59:27 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
524
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shingle Roof Replacement <br /> Terrace at Beverly Lake <br /> Everett, WA <br /> Scope of Work <br /> (220 Squares of field shingles/ 10 Squares of starter and cap shingles) <br /> 1. Remove existing shingles down to the plywood deck. <br /> 2. Install new synthetic underlayment. <br /> 3. Install (2) rows of ice and water shield at all valleys and eaves. <br /> 4. Install new aluminum drip edge along all eaves and rakes. <br /> 5. Install new 40-year dimensional shingles. <br /> 6. Install new shingle over ridge vent and cap shingles. <br /> 7. Install new neoprene pipe boots with secondary collar. <br /> 8. Reuse existing goosenecks as necessary. <br /> 9. Damaged or missing power vent covers will be replaced as necessary. <br /> 10. Properly flash around all side walls, exhaust and roof penetrations. <br /> 11. Install kick out flashings where needed. <br /> 12. Clean up and haul away all roofing debris. <br /> 13. Provide a Five (5) year standard workmanship warranty for work performed <br /> by JRC, Inc. <br /> 14. Provide a Forty (40) year manufacturer's warranty for products provided by <br /> manufacturer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.