Laserfiche WebLink
Do you have an estimated time of when I will get my permit approved once I re-submit the drawings? <br /> Thank you. <br /> On Wed,Jul 19,2023 at 3:05 PM Cal Bearman<CBearman@everettwa.gov>wrote: <br /> Category 2:Sensitive information <br /> Mr.Madrigal, <br /> Your application has been received and a permit set up.However,the submitted documents <br /> are not sufficiently developed for us to perform a comprehensive review at this time.Code <br /> references that follow are from the 2018 International Residential Code(IRC)which can be found at <br /> the following website:https://up.codes/viewer/washington/wa-residential-code-2018 <br /> Revised construction-level documents should be submitted for review per Section R106.1.1 of <br /> the IRC. Two complete sets of the revised drawings should be submitted to replace the <br /> previously submitted drawing.The drawings should specify the applicable building codes, <br /> including but not limited to the 2018 IRC. These are preliminary comments that are provided <br /> to assist but are not intended to provide a comprehensive review. Depending on your <br /> experience with the adopted codes and preparing documents,we recommend consulting <br /> with a design professional to assist you. Even if you buy an off the shelf carport from a big <br /> box store,identification of the installation via the user's manual is required. <br />