My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1816 112TH ST SE 2016-06-03
>
Address Records
>
112TH ST SE
>
1816
>
1816 112TH ST SE 2016-06-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2016 1:28:57 PM
Creation date
6/3/2016 1:28:51 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
1816
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date: 12/26/2013 <br /> `�_ Public Works Permit#: PW1312-012 <br /> ., f--J City of Everett Public Works Department <br /> 3200 Cedar Street Building Permit#; <br /> Everett, WA 98201 Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 25.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> SHELL OIL PRODUCTS, U.S. BLAINE TECH SERVICES, INC. <br /> 20945 S.WILMINGTON AVE. 20735 BELSHAW AVE. <br /> CARSON CA 90810 CARSON CA 90746 <br /> PHONE: 4254131164 PHONE: 3108854455 <br /> TAX PARCEL ID# SITE ADDRESS: 1816 112th st SE <br /> DESCRIPTION OF PROPOSED WORK: <br /> GROUND WATER MONITORING <br /> (12/26/2013 11:06 AM BES) <br /> ROUTINE GROUND WATER MONITORING OF EXISTING WELL(MW-16) <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Traffic control per approved plan 12/24/2013 by the traffic engineer. <br /> 5. Contact City of Everett inspector Cliff Lindman 425-339-7404 prior to starting construction. 3 • WIX <br /> r . <br /> l <br /> m a ISI <br /> r. rr <br /> r•a n- r <br /> c i <br /> r• <br /> rj <br /> 0 <br /> 8 O 78 <=1:A <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages,costs,expenses,or causes of action that may arise <br /> / because of installation and maintenance of the improvement <br /> or other right-of-way use hereto applied for and further agrees <br /> I •p •ved for Con ;Fon D- e to remove same upon notice from the City and to replace <br /> public property damaged thereby. <br /> FINAL INSPECTION Date /Z Z7/!5 <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.