Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> NPDES MID <br /> 12/20/2023 12/20/2023 PROJECT JIM KNAPPERT APPROVAL <br /> INSPECTION <br /> Notes: <br /> APPROVED:All 13 Elements for Construction SWPPP compliance have been adequately addressed and are installed correctly,and are being maintained <br /> correctly. <br /> 12/20/2023 12/20/2023 PW 15-ASPHALT JIM KNAPPERT PARTIAL <br /> PAVING FINAL APPROVAL <br /> Notes: <br /> ATB placed in plat. <br /> 12/20/2023 12/20/2023 PW 19-CURB OR JIM KNAPPERT PARTIAL <br /> SIDEWALK FINAL APPROVAL <br /> Notes: <br /> Installing curb in plat <br /> PW 11- <br /> 1/9/2024 1/9/2024 ROCKERY/RETAININ JIM KNAPPERT APPROVAL <br /> G WALL <br /> Notes: <br /> Installed lock and load wall. <br /> PW 18-CURB OR PARTIAL <br /> 1/9/2024 1/9/2024 SIDEWALK JIM KNAPPERT APPROVAL <br /> SUBGRADE <br /> Notes: <br /> Poured curb on 18th. <br /> 1/11/2024 1/11/2024 PW 02-ONSITE JIM KNAPPERT APPROVAL <br /> PRECON <br /> Notes: <br /> Discuss paving on 100th. <br /> PW 16-CONCRETE PARTIAL <br /> 1/11/2024 1/11/2024 FORMWORK JIM KNAPPERT APPROVAL <br /> EVALUATION <br /> Notes: <br /> Form work on 18th. <br /> PW 18-CURB OR PARTIAL <br /> 1/11/2024 1/11/2024 SIDEWALK JIM KNAPPERT APPROVAL <br /> SUBGRADE <br /> Notes: <br /> Subgrade for 18th. <br /> PW 03-EROSION <br /> 1/12/2024 1/12/2024 CONTROL JIM KNAPPERT APPROVAL <br /> EVALUATION <br /> Notes: <br /> I <br /> Printed: Friday, 13 December, 2024 3 of 14 rk <br /> SUPERION <br />