Laserfiche WebLink
DAILY FIELD REPORT Inspection Date <br /> 08/22/2023 <br /> AAR TESTING AND INSPECTION, INC. <br /> 7126 180th Ave NE, Suite C101 Report Number <br /> Redmond, WA 98052 SAA082223C <br /> 425-881-5812 <br /> CLIENT INFORMATION PROJECT INFORMATION <br /> Contact Amy Pickett Project No. 23-457 <br /> Company Pacific Ridge Homes Project Name Benton Square Detention Vault <br /> Address 17921 Bothell Everett Hwy Address 9908 18th Ave West <br /> City Bothell City Everett <br /> Contractor Superior Concrete Permit No. PW2211-012 <br /> INSPECTION TYPE(S) STRUCTURE(S) / LOCATION(S) <br /> Reinforcing Steel Detention vault walls- south half <br /> Weather Temperature(°F) Start Time End Time <br /> Cloudy 63 10:30 AM <br /> DRAWINGS/ DOCUMENTS REFERENCED <br /> S1-S4 <br /> INSPECTION OBSERVATION / REMARKS <br /> As requested, I was on site and inspected reinforcing steel placement at the south half detention vault walls. Reinforcing steel bar size, grade, <br /> spacing, lap splices, and clearances for concrete cover for the above noted location was found to be in place per plans and specifications. <br /> Items inspected are in conformance with approved plans,specifications, and jurisdictional requirements <br /> Inspectors Name Report Date Reviewers Signature Reviewed By Reviewed Date <br /> Inspectors <br /> Signature Savid Acuna 08/22/2023 Teajalam (TJ) Gounden 08/25/2023 <br /> ^✓ c2dOd6419d6c5d4a-1692746895407 <br />