Laserfiche WebLink
DAILY FIELD REPORT Inspection Date <br /> 08/16/2023 <br /> AAR TESTING AND INSPECTION, INC. <br /> 7126 180th Ave NE, Suite C101 Report Number <br /> Redmond, WA 98052 SAT081623A <br /> 425-881-5812 <br /> CLIENT INFORMATION PROJECT INFORMATION <br /> Contact Amy Pickett Project No. 23-457 <br /> Company Pacific Ridge Homes Project Name Benton Square Detention Vault <br /> Address 17921 Bothell Everett Hwy Address 9908 18th Ave West <br /> City Bothell City Everett <br /> Contractor Superior Concrete Permit No. PW2211-012 <br /> INSPECTION TYPE(S) STRUCTURE(S) / LOCATION(S) <br /> Reinforcing Steel Upper slab and vertical dowels for walls and knee wall <br /> Weather Temperature(°F) Start Time End Time <br /> Sunny 70 07:00 AM 08:30 AM <br /> DRAWINGS/ DOCUMENTS REFERENCED <br /> S3 <br /> INSPECTION OBSERVATION / REMARKS <br /> * Perimeter footing: (2) #5 longitude continuous. #5 transverse at 12"OC. <br /> * Perimeter wall dowels: (2) #4 at 12"OC. <br /> * Interior cross footing: (2) #5 longitude with #5 transverse at 12'CC. Wall dowels #5 at 12"OC. <br /> * Slab reinforcement: #4 at 18"OCEW reinforcement will be lifted as concrete is being placed. <br /> * Wing wall footing: (3) #5 longitude with #5 transverse at 12"OC. Vertical dowels #5 at 12"OC. <br /> * 4"wide rigid water stop around perimeter between wall dowels. <br /> Items inspected are in conformance with approved plans,specifications, and jurisdictional requirements <br /> Inspectors Name Report Date Reviewers Signature Reviewed By Reviewed Date <br /> Inspectors Signature Silvestre Tangalan 08/16/2023 Jq-yy;yrU Teajalam (TJ) Gounden 08/18/2023 <br /> ,,J WT_ Jr. #SI <br /> / 0108686 <br /> 7DCEDCF2-69F6-4778-8F2D-365A4DB6AC4C <br />