My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9914 18TH AVE W E 2025-03-24
>
Address Records
>
18TH AVE W
>
9914
>
9914 18TH AVE W E 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 11:58:27 AM
Creation date
2/28/2025 10:10:45 AM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9914
Unit
E
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flow Test / Final Inspection <br /> Flow Test(Bucket Test): <br /> PASS FAIL N/A <br /> 1. Test-A functional flow test (bucket test) shall be performed on all NFPA 13D El El El <br /> systems to ensure that the sprinkler system will function as designed and will <br /> deliver a sufficient quantity of water to meet all flow and listing requirements. <br /> 2. Hydraulic Placard - Locate the hydraulic placard on the riser and compare it to the El El El <br /> approved set of plans and hydraulic calculations to determine the required gpm <br /> and the most remote two sprinkler heads. <br /> Required hydraulically calculated gpm <br /> 3. Equipment&Set-Up- Prior to the Fire Inspector's arrival,the sprinkler contractor El El El <br /> shall provide and set up the following: <br /> 1. Verify that the sprinkler control valve is closed. <br /> 2. Drain the system piping. <br /> 3. Remove the two most remote heads from the system. <br /> 4. Install pipes with two%turn ball valve. <br /> 5. Install "test heads" in the end of the pipes (must be identical to system <br /> heads). <br /> 6. Install 200 psi pressure gauge. <br /> 7. Place two calibrated 55-gallon drums underneath the sprinkler heads <br /> PRESSURE GAUGE n <br /> PIPE EXTENSION <br /> BUSHING ++ BALL VALVE <br /> �1 TEST SPRINKLER HEAD <br /> CEILING JOIST <br /> BRANCH LINE <br /> PIPE TO DIRECT WATER <br /> SUPPLY PIPING <br /> TEST ASSEMBLY <br /> (see detail above) <br /> DRUM T_ FINISHED FLOOR <br /> Fire Marshal's Office 425.257.8100 everettwa.gov/fire INFORMATION HANDOUT C-7 4.20.2020 1 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.