Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> BLDG 09-FIRE PARTIAL <br /> 5/28/2024 5/28/2024 STOPPING/BLOCKIN Matt Schreifels APPROVAL 2nd floor Party Wall <br /> G <br /> Notes: <br /> 5/16/2024 7:32 AM PACIFIC RIDGE-DRH LLC <br /> Interior shear and fire stopping inspection for 1st floor party walls on entire building D.Units A through C. <br /> Contact Name:PACIFIC RIDGE-DRH LLC <br /> Site Address:9920 18TH AVE W UNIT C <br /> Phone:4254382945 <br /> e-Mail:EJSCHRADER@DRHORTON.COM <br /> Fire stopping at 2nd flr party wall <br /> 5/28/2024 5/28/2024 BLDG 11-INTERIOR I Matt Schreifels PARTIAL 2nd floor Party Wall <br /> SHEAR APPROVAL <br /> Notes: <br /> 5/16/2024 7:32 AM PACIFIC RIDGE-DRH LLC <br /> Interior shear and fire stopping inspection for 1st floor party walls on entire building D.Units A through C. <br /> Contact Name:PACIFIC RIDGE-DRH LLC <br /> Site Address:9920 18TH AVE W UNIT C <br /> Phone:4254382945 <br /> e-Mail:EJSCHRADER@DRHORTON.COM <br /> @ 2nd floor party wall <br /> 5/31/2024 5/31/2024 BLDG 08-FRAMING Matt Schreifels PARTIAL See notes <br /> APPROVAL <br /> Notes: <br /> Framing inspection for garage portal walls for entire building D. Units A through C. <br /> Framing inspection for garage portal walls only.Ok to cover for double side shear wall. <br /> BLDG 09-FIRE PARTIAL <br /> 6/3/2024 6/4/2024 STOPPING/BLOCKIN Matt Schreifels APPROVAL 3rd floor party wall-Fire Stop <br /> G <br /> Notes: <br /> @ 3rd floor party wall-Fire Stop <br /> 6/3/2024 6/4/2024 BLDG 11-INTERIOR Matt Schreifels APPROVAL 3rd floor party wall <br /> SHEAR <br /> Notes: <br /> @ 3rd floor party wall <br /> 6/17/2024 6/17/2024 BLDG 07-EXTERIOR Matt Schreifels PARTIAL See Notes <br /> SHEAR APPROVAL <br /> Notes: <br /> Exterior shear inspection for entire building D.Units A through C <br /> Upload special inspections report for shear walls with nailing of 4:o.c.and less <br /> 6/17/2024 6/17/2024 BLDG 10-DRYWALL Matt Schreifels PARTIAL Exterior vertical Densglass <br /> NAILING APPROVAL <br /> Notes: <br /> Exterior dense glass drywall inspection on party walls for building D.Units A through C. <br /> I <br /> Printed:Wednesday, 20 November, 2024 3 of 6 rk <br /> SUPERION <br />