My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1321 COLBY AVE BASE FILE 2025-04-16
>
Address Records
>
COLBY AVE
>
1321
>
BASE FILE
>
1321 COLBY AVE BASE FILE 2025-04-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 11:19:37 AM
Creation date
3/3/2025 10:26:26 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1321
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVENED <br /> Cm civil&structural MAY 0 4 2023 <br /> ENGINEERING engineering&planning CITY OF EVERETT <br /> Permit Services <br /> MEMORANDUM <br /> To: Ryka Consulting <br /> From: Mike Maechler,PE,SE <br /> Date: February 7th,2023 <br /> Re: AT&T Site: WA6299 Port Gardner—Mount Analysis(CG Project No.23007.126) <br /> CG Engineering was retained by Ryka Consulting to provide structural analysis of the antenna anchorage for the site <br /> modifications proposed by AT&T per the agreed upon Scope of Work and in accordance with the 2018 International Building <br /> Code as amended by the local jurisdiction. The site is located at 1321 Colby Avenue,Everett WA. <br /> The structural mount analysis completed by CG Engineering was inclusive of the structural elements that were affected by the <br /> addition of antennas&RRU's associated with the proposed AT&T equipment deployment.Where applicable,this includes <br /> the antenna support structure,mounts,connections,appurtenances,and attachments to the main structure. <br /> Proposed Modifications: <br /> • Add(3)new Nokia AEQK,(1)per sector <br /> • Add(3)new CommScope NNH4-65C-R6-HG,(1)per sector <br /> • Add(3)new RRH 4T4R B12/14/29,(1)per sector <br /> • Add(3)new DC6-48-60-18,(1)per sector <br /> • Replace(3)exist 24"dia FRP shrouds with(3)42"dia FRP shrouds,(1)per sector <br /> • Relocate(3)existing shrouds,(2)at Gamma sector and(1)at Beta sector <br /> • Relocate(3)existing RRH AHCA units from the equipment room to the rooftop frames,(1)per sector <br /> • Remove(3)KMW EPBQ 654L8H8,(1)per sector• Remove(3)Kathrein 742-265,(1)per sector \-\ 00zEo <br /> • Remove(6)LGP214010 TMAs,(2)per sector <br /> • Remove(3)RRH 4T4R B14 160 FRBI,(1)per sector 2023 <br /> • Remove(3)RRH2x40W_7L,(1)per sector JUN 0 2 <br /> Antenna/Radio Unit Anchorage: CITY ®� ��ER 'I'T <br /> We have determined that the antenna&radio unit mounts and their attachmen s to @ rVe4101 6f$tructure are <br /> adequate.No upgrades are required. The new appurtenances shall be mounted to the existing 3"standard pipe mounts(3 <br /> 1/2"O.D.)with the hardware recommended by their respective manufacturer.Anchor the(3)relocated shrouds to the <br /> existing roof slab per the original installation details(attached for reference).The(3)new FRP shrouds and their attachments <br /> to the existing pipe masts will be designed by the FRP manufacturer.The contractor shall field verify that all(9)existing pipe <br /> masts are 3"standard pipe minimum(3 1/2"OD x 0.216"thick). <br /> Rom' <br /> 49 wAs.b. <br /> A• <br /> m. <br /> 250 4th Avenue South,Suite 200 <br /> S,r I ft 02/07/23 Edmonds,WA 98020 <br /> pj, ph.425.778.8500 I f.425.778.5536 <br /> www.cgengineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.