My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-27 2025-05-28
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-27
>
3003 W CASINO RD BLDG 40-27 2025-05-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 11:39:02 AM
Creation date
3/3/2025 10:32:55 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-27
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTTO ROSENAU & ASSOCIATES, INC. <br /> Geotechnical Engineering, Construction Inspection & Materials Testing <br /> REINFORCING STEEL INSPECTION REPORT <br /> Report Number: RS460433 <br /> Project Name: Boeing - Bldg. 40-27 Side of Body Access Stands Job Number: 23-0861 <br /> Project Address: Building 40-27, Everett Permit: B2309-055 <br /> Client Name: The Boeing Company <br /> Description <br /> Grade: 60 Manufacturer: Cascade <br /> Type of Bar: W A-615 ❑ A-706 ❑ N/A Special Ductile Quality(SDQ) Steel: No <br /> Inspector Stuctural Elements/ Location/Grid Lines <br /> and Date <br /> Mark Gray <br /> 12/23/2023 1. Footing &Walls, for tunnel at approx. grids T.6—T.7/6.57-6.9 per layout on sheet <br /> 1 S10-27 of drawings, dated 03/02/2023 supplied by the contractor. <br /> Inspected reinforcing steel for size, type, clearances, lap, &spacing per the following <br /> details: <br /> • Section details per A/S281. <br /> • Embed drawings from AAA Welding, dated 10/26/2023. <br /> • Bar splice, lap, and development information per plan notes and General Structural <br /> Notes on sheet S2n. <br /> Notes: This is an initial inspection of the tunnel section prior to installation. A final <br /> inspection will take place before and after installation to inspect clearances—work in <br /> progress. <br /> Based on information made available at the time of the inspection, the work was inspected <br /> to the best of my knowledge per approved contract documents made available at time of <br /> the inspection date <br /> Preliminary report <br /> Date: 2023.12.28 <br /> Copies to: ���`��"--�UO <br /> 0 Client ❑ Engineer ❑ Others 06:46:53 -08�00 <br /> � <br /> Technical Responsibility: <br /> ❑d Owner ❑d Contractor <br /> ❑ Architect ❑� Building Dept Isaac Ruoff, Project Manager <br /> This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau&Associates, Inc. Reproduction of this <br /> report except in full,without written permission from our firm is strictly prohibited. <br /> 6747 M.L. King Way S.,Seattle,Washington 98118—Phone(206)725-4600—Fax(206)723-2221 <br /> Form No.:ADMIN-76-02(Rev 03110) Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.