Laserfiche WebLink
The comments below were generated from this project's Stormwater Reviewers. All questions shall be routed through this project's Public Works Reviewer <br /> Thad Newport with City of Everett Permit Services (TNewport(@everettwa.gov). <br /> # Document Sht/Pg Reviewer's Comment Designer's Response Initials <br /> 5 Stormwater Geotechnical Submit the final signed/stamped geotech report for the A signed copy has been included in this KJH <br /> Technical Engineering project. The geotech report submitted is not signed. revision as part of the Stormwater Technical <br /> Memorandum Report Memorandum. <br /> 6 Stormwater 4 Provide a copy of the Ecology Industrial Discharge Permit A copy of the permit coverage letter has KJH <br /> Technical approval. been added to the appendices. <br /> Memorandum <br /> 7 Stormwater - Include a figure of the site and highlight/shade the Drainage Basin Exhibit has been KJH <br /> Technical project's drainage areas. Clearly show if these areas added to the Appendix. <br /> Memorandum are flowing to detention/ runoff treatment or if they are Physically roof runoff does not enter <br /> bypassing. the detention system. An area of <br /> additional pavement equal to the <br /> • It appears that roof runoff from the Bus Maintenance roof area has been collected from <br /> building expansion will bypass detention. Include this the portion of the site not being <br /> as a bypass in the model. redeveloped. This alternate area is <br /> sent to the vault where the required <br /> flow control is provided. <br /> Page 4 of 12 <br />