My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7100 HARDESON RD SITE DEVELOPMENT 2025-07-17
>
Address Records
>
HARDESON RD
>
7100
>
SITE DEVELOPMENT
>
7100 HARDESON RD SITE DEVELOPMENT 2025-07-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2025 10:56:21 AM
Creation date
3/4/2025 2:48:25 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7100
Tenant Name
SITE DEVELOPMENT
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The comments below were generated from this project's Stormwater Reviewers. All questions shall be routed through this project's Public Works Reviewer <br /> Thad Newport with City of Everett Permit Services (TNewport(@everettwa.gov). <br /> # Document Sht/Pg Reviewer's Comment Designer's Response Initials <br /> 5 Stormwater Geotechnical Submit the final signed/stamped geotech report for the A signed copy has been included in this KJH <br /> Technical Engineering project. The geotech report submitted is not signed. revision as part of the Stormwater Technical <br /> Memorandum Report Memorandum. <br /> 6 Stormwater 4 Provide a copy of the Ecology Industrial Discharge Permit A copy of the permit coverage letter has KJH <br /> Technical approval. been added to the appendices. <br /> Memorandum <br /> 7 Stormwater - Include a figure of the site and highlight/shade the Drainage Basin Exhibit has been KJH <br /> Technical project's drainage areas. Clearly show if these areas added to the Appendix. <br /> Memorandum are flowing to detention/ runoff treatment or if they are Physically roof runoff does not enter <br /> bypassing. the detention system. An area of <br /> additional pavement equal to the <br /> • It appears that roof runoff from the Bus Maintenance roof area has been collected from <br /> building expansion will bypass detention. Include this the portion of the site not being <br /> as a bypass in the model. redeveloped. This alternate area is <br /> sent to the vault where the required <br /> flow control is provided. <br /> Page 4 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.