Laserfiche WebLink
• A landscaping plan for the new spaces. <br /> Refer to Drawing CL.01, Landscaping <br /> Overall Site Plan. <br /> Please address the intrusion into buffer <br /> area (see exhibit A attached). Per <br /> Community Transit, vehicles are no <br /> longer being parked in the buffer area. <br /> The area will be re-striped during Phase <br /> 2 to eliminate parking. Refer to CL.00, <br /> Landscaping Overall Site Plan, for <br /> Perimeter Landscaping Requirements. <br /> Address the proposed timing or solution <br /> as it relates to the permit for expansion of <br /> Maintenance Building and the <br /> removal/relocation of required parking. <br /> All parking relocation is anticipated to be <br /> complete in the spring of 2023. During <br /> construction of the Maintenance Building <br /> expansion, temporary parking for <br /> displaced parking stalls will be provided <br /> in the Southwest corner of the site. <br /> 27 Civil CG.00 A site plan showing proximity of storm vault as described The dimension from the vault to Ordinary KJH <br /> in the SEPA checklist and its proximity to Merrill Ring High Water has been added to the Grading <br /> Creek and buffer. Please see the Critical Areas code and Drainage Drawings <br /> EMC19.37. <br /> Page 12 of 12 <br />