Laserfiche WebLink
FRANCHISE UTILITY Date Applied: 4/27/2022 <br /> PERMIT PW Utility Permit#: FRU2204-046 <br /> City of Everett Permit Services Parent Permit#: BLP2201-004 <br /> E V E R E T T <br /> 3200 Cedar Street, 2nd Floor Permit Type: FRANCHISE UTILITY <br /> WASHINGTON Everett, WA 98201 Permit Subtype: ZIPLY FIBER <br /> 425-257-8810 Permit Fee: $65.00 <br /> UTILITY COMPANY NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> ZIPLY FIBER TRACK UTILITIES LLC <br /> 1800 41st St, N-100 941 S INDUSTRY WAY <br /> Everett,WA,98203 Meridian, ID,83642 <br /> PHONE:4252634020 PHONE:2083621780 <br /> TAX PARCEL ID#:00517155400100 SITE ADDRESS:2401 RUCKER AVE <br /> DESCRIPTION:ZIPLY-5511150 <br /> New aerial overlash to existing cable/strand to MDU terminal. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development. <br /> 2. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 3. All work including Traffic Control must be done in accordance with MUTCD Standards and the attached plans approved by City of Everett. <br /> 4. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 5.Street restoration must be done per COE Standard Drawing#326 and trench restoration per#614,or as directed by the City PW Inspector. <br /> Permanent restoration must be completed within 2 weeks of completion of utility work. <br /> 6. Full lane width grind and overlay is required for trenches greater than 100'in length,multiple cuts within a 100'length section,and/or as <br /> directed by the City PW Inspector. <br /> 7. A minimum of 5ft separation between City of Everett utilities and directional boring/pavement cuts shall be maintained. <br /> 8. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections. Inspections are required for job start notification,potholing all City utilities,evaluation of traffic control set-up,to view <br /> the work prior to backfill,and after final restoration to final the permit. Request a final inspection online by selecting PW 25-Site Final/Permit <br /> Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> 9. Potholing required for all crossings over/under City of Everett water mains. <br /> 10. Coordinate with adjoining businesses/homeowners to minimize obstruction of commerce/access. <br /> 11. Noise from temporary construction sites is not allowed 10:OOPM—7:OOAM weekdays,6:OOPM—8:OOAM weekends unless a variance has <br /> been issued.Construction projects wishing a variance from the noise ordinance must submit an application at least 30 days prior to <br /> commencing work. Please visit the following website for more information https://everettwa.gov/1545/Noise-Administration <br /> Public Works Permit Fee Breakdown: <br /> Misc. Minor Permits.......................................................$25.00 <br /> PW Plan Review.........................................................$20.00 <br /> PW Site Inspection.....................................................$20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> �/ may arise because of installation and maintenance of the <br /> 4 7d ycW 05/17/2022 improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAYBE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />