My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Everett Gospel Mission 2/27/2025
>
Contracts
>
Real Property
>
Other Real Property
>
Everett Gospel Mission 2/27/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 11:28:41 AM
Creation date
3/5/2025 11:27:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Everett Gospel Mission
Approval Date
2/27/2025
End Date
2/24/2026
Department
Facilities & Property Management
Department Project Manager
Paul McFee
Subject / Project Title
Everett Gospel Mission Pallet Shelter Site Lease 2025
Tracking Number
0004708
Total Compensation
$0.00
Contract Type
Real Property
Contract Subtype
Other Real Property
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
g. If EGM determines to install air conditioners to Pallet Shelters, EGM may <br />make such installation(s) at EGM's sole cost. Upon termination of this Lease, EGM shall <br />remove such air conditioners and repair any damage caused by air conditioner <br />installation and removal. <br />Section fi. UTILTIES AND SERVICES <br />a. The City will provide and maintain water and sewer connections to the <br />Property at the City's cost. EGM will pay for all Project water and sewer usage. If users <br />of the Project damage the water or sewer connections, EGM will repair such damage at <br />EG M's cost. <br />b. The City will provide and maintain electricity connections to the Property <br />and electricity connections to the exterior of each of the Pallet Shelters at the City's <br />cost. EGM will pay for all Project electricity usage. If users of the Project damage the <br />electricity connections, EGM will repair such damage at EGM's cost. <br />c. If gas service is determined necessary by mutual agreement of the City <br />and EGM, the City will provide and maintain gas connections at the City's cost. EGM will <br />pay for all Project gas usage. If users of the Project damage the gas connections, EGM <br />will repair such damage at EGM's cost. <br />d. EGM will pay for any other utilities or services (including without <br />limitation garbage service and internet) as necessary for the Project. <br />Section 7. REPAIR OF PROPERTY. EGM shall use care to avoid damaging or <br />destroying City property by reason of its operations pursuant to this Lease. Any damage <br />caused by EGM to City or other property shall be promptly repaired or replaced by EGM <br />to the satisfaction of the City, or in lieu of such repair or replacement, EGM shall pay, to <br />the City or the owner of the other property, money in an amount sufficient to <br />compensate for the loss sustained by reason of damage to or destruction of the City's or <br />other party's property. <br />Section 8. PROPERTY REPAIR BY CITY. The City shall have right, but not the duty, at <br />any time to make repairs, alterations, connections or extensions to the Property or <br />Pallet Shelters as the City deems necessary. <br />Section 9. INSPECTION AND RIGHT OF ENTRY, The City and its agents shall have <br />the right, but not the duty, to inspect the Property and the Pallet Shelters at any time to <br />determine whether EGM is complying with the terms of this Lease. If EGM is not in <br />compliance with this Lease, the City shall have the right, but not the duty, to <br />immediately enter upon the Property to remedy any conditions or circumstances caused <br />by EGM's failure to comply with the terms hereof, and EGM shall reimburse the City for <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.