My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hultz BHU Engineers Inc 3/3/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Hultz BHU Engineers Inc 3/3/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 11:48:49 AM
Creation date
3/5/2025 11:48:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Hultz BHU Engineers Inc
Approval Date
3/3/2025
End Date
12/31/2026
Department
Facilities & Property Management
Department Project Manager
Karen Schraven
Subject / Project Title
ASHRAE Level 2 Energy Audit on Everett Performing Arts Center, Police HQ and City Buildings
Tracking Number
0004709
Total Compensation
$42,850.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />SCOPE OF WORK <br />Hultz|BHU will provide an ASHRAE Level 2 Building Energy Audit for the Everett Police <br />Headquarters/Old City Hall Building, and the Everett Performing Arts Center, per the <br />requirements listed in the AWC Energy Audit Grant Program. The purpose of the Audit i s to <br />provide analysis of the building’s energy consumption by end -use to identify areas with the <br />greatest opportunities for energy efficiency. <br />Hultz|BHU will provide engineering services. Their work will be to interview staff, and analyze <br />the building’s various envelope, electrical, mechanical, and control systems that serve the <br />building, and provide Energy Conservation Measures (ECMs) to reduce the buildings’ Energy <br />Use Intensity (EUI). <br />The deliverable for each building will be a report with, as a minimum, the following sections: <br />• Table of Contents <br />• Executive Summary which would include estimated costs for an energy management <br />plan, and operations and maintenance program. <br />• Background <br />• Facility Description <br />• Utility Summary including Energy Use Intensity Calculations, using Energy Star’s <br />Portfolio Manager. <br />• Benchmarking <br />• Energy Conservation Measures (ECMs, also known as EEMs) with estimated energy <br />savings, and first costs for each measure <br />• Appendix: Completed US DOE Asset Score/Audit Template tool. This is listed as “Form <br />D” in the Clean Buildings Performance Standard (CBPS) <br />Hultz|BHU will provide these services on an hourly basis not to exceed $20,905 for Everett <br />Performing Arts Center and not to exceed $21,945 for Everett Police HQ/Old City Hall. Added <br />work is summarized on the attached task and hours breakdown . <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.