My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hultz BHU Engineers Inc 3/3/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Hultz BHU Engineers Inc 3/3/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 11:48:49 AM
Creation date
3/5/2025 11:48:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Hultz BHU Engineers Inc
Approval Date
3/3/2025
End Date
12/31/2026
Department
Facilities & Property Management
Department Project Manager
Karen Schraven
Subject / Project Title
ASHRAE Level 2 Energy Audit on Everett Performing Arts Center, Police HQ and City Buildings
Tracking Number
0004709
Total Compensation
$42,850.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Hultz/BHU Engineers (253) 383-3257 <br />Consulting Engineers <br />Project:Everett Police Headquarters / Old City Hall - ASHRAE Level 2 Energy Audit <br />Work:Mechanical Engineering <br />- Assoc Senior Senior Project Project Senior CAD .- <br />Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical <br />Generate Building Energy Model 1 4 30 2 <br />Cross-check model w/ Utilites 2 4 4 <br />Site Visit - Gather Exist Cond 6 6 <br />Interviews with Staff 2 2 <br />Modify model for ECMs 2 12 <br />Cost Estimate for ECMs 2 12 <br />EUI Analysis 4 8 <br />Draft Level 2 Audit Report 12 4 12 <br />Review Meeting 4 <br />Incorporate Meeing Comments 2 2 2 <br />Complete WA CBPS Form D 4 <br />Hour Total 1 44 0 0 80 0 0 6 14 <br />Labor Hourly Rate $225.00 $185.00 $160.00 $155.00 $150.00 $135.00 $120.00 $100.00 $70 <br />Labor Cost Sub-Totals $225 $8,140 $0 $0 $12,000 $0 $0 $600 $980 <br />DESIGN PHASE TOTAL:$21,945 <br />- Assoc Senior Senior Project Project Senior CAD .- <br />Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical <br />$225.00 $185.00 $160.00 $155.00 $150.00 $135.00 $120.00 $100.00 $70.00 <br />E N G I N E E R I N G H O U R S <br />12/11/2024 <br />DESIGN PHASE <br />Hourly Rates <br />Exhibit A (Scope of Work)
The URL can be used to link to this page
Your browser does not support the video tag.