My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Association of Washington Cities (AWC) 2/19/2025
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Association of Washington Cities (AWC) 2/19/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 2:47:19 PM
Creation date
3/5/2025 2:46:52 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Association of Washington Cities (AWC)
Approval Date
2/19/2025
End Date
5/31/2025
Department
Facilities & Property Management
Department Project Manager
Karen Schraven
Subject / Project Title
AWC Energy Audit Grant Program
Tracking Number
0004713
Total Compensation
$42,850.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />________________________________________________________________________________________________________ Page 2 of 17 <br />Face sheet <br />Subgrant Number: [SUBGRANT #] <br /> <br />AWC Energy Audit Grant Program <br />1. Subgrantee 2. Subgrantee Doing Business As (as applicable) <br />City of Everett <br />3. Subgrantee Representative 4. AWC Representative <br />Karen Schraven <br />Resource Conservation Program Manager <br /> <br />Brianna Morin <br />Legislative Policy Analyst <br /> <br />5. Subgrant Amount 6. Start Date 7. End Date <br />$42,850 7/1/2024 5/31/2025 <br />8. Uniform Business Identifier (UBI) <br />313-000-656 <br />9. Subgrant Purpose <br />The purpose of the grant is to: <br />• Assist cities who own Tier 1 and Tier 2 covered buildings in completing energy audits. <br />• Collect data on the costs for cities to comply with the state’s Clean Buildings Performance Standard (CBPS). <br /> <br />AWC and the Subgrantee, as defined above, acknowledge and accept the terms of this Subgrant and attachments and <br />have executed this Subgrant on the date below to start as of the date and year referenced above. The rights and <br />obligations of both parties to this Subgrant are governed by this Subgrant and the following other documents incorporated <br />by reference: Subgrantee General Terms and Conditions including Attachment “A” – Scope of Work; Attachment “B” – <br />Budget & Budget Narrative; Attachment “C” – Reporting Requirements. <br />This Subgrant shall be effective upon signature by both Parties (“Start Date”). The term (“Term”) of this Subgrant shall <br />begin on the Start Date and end on the End Date. This Subgrant shall remain in effect until such time as it is terminated <br />as provided herein. <br />FOR SUBGRANTEE FOR AWC <br /> <br /> <br /> <br /> <br />Cassie Franklin, Mayor <br /> <br />Date <br /> <br /> <br /> <br /> <br />Tim Benedict, City Attorney <br /> <br />Date <br /> <br /> <br /> <br /> <br />Ashleigh Scott, Deputy City Clerk <br /> <br />Date <br /> <br /> <br /> <br /> <br /> <br />Deanna Dawson, CEO <br /> <br /> <br /> <br />Date <br /> <br /> <br /> <br />Docusign Envelope ID: E11F3824-B57B-4827-BEDB-7B35A1462326 <br />2/19/2025 <br />2/19/2025 <br />2/19/2025 <br />2/24/2025
The URL can be used to link to this page
Your browser does not support the video tag.