Laserfiche WebLink
<br /> <br /> <br />2.2.1 Project activities and milestones <br />The Grantee shall include project activities and milestones achieved to date and anticipated in <br />the next quarter, and any changes to the project management report, project partner list, risks <br />and issues mitigated, and lessons learned. Activities and milestones must include: <br /> <br /> Information received from the electric utility serving each project site on expected <br />electrical make-ready (on both the utility and customer sides of point of service <br />delivery) and interconnection activities, costs, and timing. <br /> Expected permitting activities, costs, and timing. <br />2.2.2 Project expenditures <br />The Grantee shall include an updated milestone/invoicing schedule with invoices completed to <br />date and anticipated milestone completion dates for the duration of the grant. While Commerce <br />does not anticipate requiring more detailed expenditure information as part of quarterly <br />reporting, Grantee shall maintain project fiscal records in alignment with Generally Accepted <br />Accounting Principles (GAAP) and in sufficient detail to show that a) grant funding has been <br />spent only on eligible costs as outlined in Attachment D: Sample Application Manual, and b) <br />grant funds have not been comingled with any non-grant (match) funds. <br />2.3 Change orders <br />Changes to Attachment A: Scope of Work and/or Attachment C: Site List may be requested <br />by the Grantee using the change order request template provided by COMMERCE. Within the <br />limits defined in Subsections 2.3.1-2.3.4 of Attachment A: Scope of Work, Commerce may <br />consider and accept such changes. For change order forms affecting only information contained <br />in Attachment A: Scope of Work and/or Attachment C: Site List, a change order will be <br />considered to be accepted by COMMERCE once the applicable COMMERCE representative <br />has signed the form. Change orders affecting contract information outside of Attachment A: <br />Scope of Work and/or Attachment C: Site List (including but not limited to: grant amount, start <br />date, or end date) require a formal contract amendment. <br />2.3.1 Grant amounts <br />Change orders may be accepted by COMMERCE if such orders change the scope of work in a <br />way that requires a lower or same COMMERCE grant amount as the current contract. <br />Commerce will not consider change order requests if the scope of work changes such that <br />projects can only be successfully completed with a higher grant amount than the original <br />contract. <br />Change orders that remove sites, reduce the quantity of charging ports, or result in removed <br />adders must also reduce the maximum grant amount in this contract consistent with the award <br />process as detailed in the Attachment D: Sample Application Manual. <br /> <br /> <br /> <br />Docusign Envelope ID: 9CA32415-9130-4D24-B542-1ED1AA5501F1