My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA Department of Commerce 1/28/2025
>
Contracts
>
6 Years Then Destroy
>
2025
>
WA Department of Commerce 1/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 8:29:49 AM
Creation date
3/5/2025 2:48:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA Department of Commerce
Approval Date
1/28/2025
Council Approval Date
12/4/2024
End Date
7/7/2025
Department
Facilities & Property Management
Department Project Manager
Karen Schraven
Subject / Project Title
WAEVCP Grant for Public EV Chargers at Two Libraries
Tracking Number
0004714
Total Compensation
$442,000.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />9 <br />sites, the program award can only cover up to seventy-five percent (75%) of project costs. This means <br />that the applicant, if a grantee, would need to find a way to cover the remaining twenty-five percent <br />(25%) of costs, which could be in the form of other grants or incentfves. <br />Scoring <br />Scoring is done on a per-site basis. An applicatfon can contain multfple sites of any eligible site type. <br />There is no minimum score. Scoring includes data from the Mapping Tool and other key informatfon <br />about the proposed installatfon. Applicants must use the relevant Mapping Tool while completfng their <br />applicatfon and have the details ready if requested. <br />The applicatfon document contains drop-down menus and other automatfon to reduce data entry by <br />applicants. Technical assistance is available to any applicant between September 6 and December 1, <br />2023. All scoring will be verified by the Department of Commerce during applicatfon review. <br />Mapping Tool Links: <br /> Residential Tool for Multifamily Housing Sites: https://bit.ly/EV-Residentfal-Grant-App <br /> Public Tool for All Other Sites: https://bit.ly/EV-Public-Grant-App <br /> <br />Residential – Multifamily Housing <br />Factor Metric Points Percen <br />t <br />Housing affordability WTN Unaffordability of Housing Score <br />Multfply score by 3 <br /> <br />Data: WTN Unaffordable Housing (>30% of <br />Income) <br />30 30% <br /> <br /> <br />Low-income WTN Median Household Income <br />Multfple scores by 2 <br /> <br />Data: WTN Median Household Income <br />20 20% <br /> <br />Overburdened <br />community <br />9-10, tribal lands and propertfes – 30 <br />7-8 – 25 <br />1-6 – Multfply by 3 <br /> <br />Data: WTN EHD <br />30 30% <br /> <br />Labor Commitment to electrician apprentfceship <br />utflizatfon rates: <br />25% - 10 <br />20% - 5 <br />15% - 0 (Required) <br />10 10% <br /> <br />Commitment to use Project Labor Agreement <br />with constructfon workers (Y or N) <br />5 5% <br />Docusign Envelope ID: 9CA32415-9130-4D24-B542-1ED1AA5501F1
The URL can be used to link to this page
Your browser does not support the video tag.