Laserfiche WebLink
Page 4 of 6State of Washington Department of Ecology <br />City of Everett <br />City of Everett Port Gardner Water Quality Program – Phase 1 Design Project <br />Agreement No. WQC-2024-EverPW-00027 <br />3.6 Responses to ECOLOGY 90 Percent Design Package comments. <br />Upload to EAGL and notify ECOLOGY. <br />3.7 ECOLOGY 90 Percent Design Acceptance Letter . <br />Upload to EAGL and notify ECOLOGY. <br />3.8 Final Bid Package. <br />Upload to EAGL and notify ECOLOGY. <br />3.9 Responses to ECOLOGY Final Bid Package comments. <br />Upload to EAGL and notify ECOLOGY. <br />3.10 Ecology Final Bid Package Acceptance Letter. <br />Upload to EAGL and notify ECOLOGY. <br />3.11 Bid Documents (e.g. bid announcement, bid tabulations, and bid award). <br />Upload to EAGL and notify ECOLOGY. <br />3.12 Construction Quality Assurance Plan. <br />Upload to EAGL and notify ECOLOGY. Upload ECOLOGY <br />acceptance documentation. <br />3.13 Pre-Construction Conference Meeting Minutes. <br />Upload to EAGL and notify ECOLOGY. <br />3.14 Project Schedule. <br />Submit prior to construction and when changes occur. Upload to EAGL <br />and notify ECOLOGY. <br />Template Version 10/30/2015 <br />Docusign Envelope ID: 7E68FB31-87CC-499F-9B4D-FEBDEE9B862C