Laserfiche WebLink
City of Everett Lift Station No. 1 Valve Replacement <br /> <br /> Scope of Services 10 <br />• Printing: <br />o B&W 8.5x11: $0.15 per page <br />o B&W 11x17: $0.30 per page <br />Schedule <br />The schedule lengths for Tasks 100, 200, 300, and 400 are as follows: <br />• Task 100: Project Management 10 months <br />• Task 200: Permitting Support 8 months <br />• Task 300: Design 8 months <br />o Task 301: Preliminary Design 2 months <br />o Task 301: 50 Percent Design 4 months (overlap with Task 301) <br />o Task 302: 90 Percent Design 3 months <br />o Task 303: Final Construction Bid Documents 1 month <br />• Task 400: Bid Assistance 2 months <br />