My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 2/16/2025
>
Contracts
>
6 Years Then Destroy
>
2025
>
Bayley Construction LP 2/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 3:39:40 PM
Creation date
3/5/2025 3:39:18 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
2/16/2025
Council Approval Date
2/12/2025
End Date
4/30/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Multipurpose Stadium Project
Tracking Number
0004723
Total Compensation
$150,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />SCOPE OF WORK <br />This scope of work is for immediate priorities necessary to advance project planning <br />and preconstruction activities, including: <br />• Hold weekly coordination meetings with the City and SOJ; <br />• Organize/schedule project kickoff sessions and stakeholder engagement <br />workshops with the City, SOJ, Everett AquaSox, United Soccer League (USL) <br />and others; <br />• Start procurement of site investigation sub-contractors and sub-consultants <br />(potholing utilities, survey, geotechnical/soils, environmental, hazardous <br />materials); <br />• Survey work; <br />• Refine preliminary project schedule and work plan developed during RFP <br />process; <br />• Refine conceptual layouts/design ideas developed during RFP process; <br />• Refine preliminary target value estimate developed during RFP process; <br />• Develop preliminary subcontracting plan; <br />• Develop preliminary basis of design; <br /> <br /> <br />This interim contract will be superseded by the contract for Phase 1 Preconstruction and <br />Design Services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.