Laserfiche WebLink
2021 Stormwater System Development Fee Calculations <br /> Permit 4: B2107-004 Additional Notes: <br /> Project Address: 7400 Hardeson Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: JTB Date: 8/6/2021 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: � /�9 Date: on 1s 20't 1 <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> Permit#: B2107-004 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 500 SF <br /> Stormwater System Dev Fee: $131.65 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: PW2108-016 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 1,364 SF <br /> Stormwater System Dev Fee: $359.14 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />