My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7100 HARDESON RD Geotech Report 2025-03-06
>
Address Records
>
HARDESON RD
>
7100
>
Geotech Report
>
7100 HARDESON RD Geotech Report 2025-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 2:46:08 PM
Creation date
3/6/2025 2:44:17 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7100
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 14, 2020 <br /> llerracon <br /> ' KPFF Consulting Engineers GeoReport. <br /> 1601 5th Avenue, Suite 1300 <br /> Seattle, Washington 98101 <br /> Attn: Mr. Rob Price — Project Manager <br /> P: (206) 484-8442 <br /> E: rob.price@kpff.com <br /> Re: Geotechnical Engineering Report <br /> ' Merrill Creek Operations Base Expansion <br /> 7100 Hardeson Road <br /> ' Everett, Washington 98203 <br /> Terracon Project No. 81205012 <br /> Dear Mr. Price: <br /> We have completed the Geotechnical Engineering Report to satisfy the 90-percent design <br /> ' reporting services for the above referenced project. This study was performed in accordance with <br /> KPFF Agreement No. 2000026 dated April 10, 2020. This report presents the findings of the <br /> subsurface exploration and provides geotechnical recommendations concerning earthwork, the <br /> ' design and construction of building foundations, floor slabs, excavation design, and pavements <br /> for the proposed project. We considered and incorporated mostly minor edits and revisions to the <br /> "draft" version of this report (dated July 31, 2020); this report supercedes the draft report. <br /> ' The site subsurface includes a thick layer of relatively dense granular fill atop a sequence of loose <br /> to dense layers of granular soil. Based upon the thick and relatively dense, granular upper soils <br /> ' and relatively low expected foundation and floor slab loads, we recommend support of the building <br /> on shallow spread footings. <br /> ' We appreciate the opportunity to be of service to you on this project. If you have any questions <br /> concerning this report or if we may be of further service, please contact us. <br /> Sincerely, <br /> Terracon Consultants, Inc. <br /> .00MAs <br /> Hof WA$,,,�4� , <br /> A,,Y16& <br /> 43 • <br /> 688 <br /> qlv,f <br /> ' <br /> Chad T. McMullen, P.E. 494/0NALB • <br /> Dennis R. Stettler, P.E. <br /> Project Engineer izi=aizozo Senior Engineering Consultant <br /> 1 <br /> Terracon Consultants, Inc. 21905 64th Ave. W, Suite 100 Mountlake Terrace, WA 98043 <br /> (425) 771 3304 F (425) 771 3549 www.terracon.com <br /> Environmental Facilities Geotechnical Materials <br />
The URL can be used to link to this page
Your browser does not support the video tag.