My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1815 HOLBROOK AVE 2025-03-06
>
Address Records
>
HOLBROOK AVE
>
1815
>
1815 HOLBROOK AVE 2025-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 3:54:14 PM
Creation date
3/6/2025 3:01:40 PM
Metadata
Fields
Template:
Address Document
Street Name
HOLBROOK AVE
Street Number
1815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Prevent, during the construction phase, adverse water quality <br /> impacts including impacts on beneficial uses of the receiving water <br /> by controlling peak flow rates and volumes of stormwater runoff at <br /> the Permittee's outfalls and downstream of the outfalls. <br /> 4. This SWPPP was prepared using the Ecology SWPPP Template. <br /> This SWPPP was prepared based on the requirements set forth in the <br /> Construction Stormwater General Permit and in the Stormwater <br /> Management Manual for Western Washington(SWMMWW 2005). <br /> The 13 BMP Elements <br /> Element#1 —Mark Clearing Limits <br /> To protect adjacent properties and to reduce the area of soil exposed to <br /> construction,the limits of construction will be clearly marked before land- <br /> disturbing activities begin. <br /> Element#2—Establish Construction Access <br /> Construction access or activities occurring on unpaved areas shall be minimized, <br /> yet where necessary, access points shall be stabilized to minimize the tracking of <br /> sediment onto public roads, and wheel washing, street sweeping, and street cleaning <br /> shall be employed to prevent sediment from entering state waters. <br /> Install the temporary construction entrance, according to the approved construction <br /> plans, prior to any clearing or grading activities. Maintain until the access road is <br /> paved. <br /> Element#3—Control Flow Rates <br /> In order to protect the properties and waterways downstream of the project site, <br /> stormwater discharges from the site will be controlled. In general, discharge rates of <br /> stormwater from the site will be controlled where increases in impervious area or <br /> soil compaction during construction could lead to downstream erosion, or where <br /> necessary to meet local agency stormwater discharge requirements. <br /> Element#4—Install Sediment Controls <br /> Install silt fencing, according to the approved plans, prior to any clearing or grading <br /> activities. Maintain until all construction activities are completed. <br /> Install catch basin filters, according to the approved construction plans, as catch basins <br /> become operable. Maintain until all construction activities are completed. <br /> Element#5—Stabilize Soils <br /> Insight Engineering Co. - Stormwater Site Plan 6/22/2022 <br /> - 14- <br />
The URL can be used to link to this page
Your browser does not support the video tag.