Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> MEMORANDUM <br /> TO: Brian Kalab, P.E.I IECO,425-303-9363 <br /> CC: David Nolan I Owner,425-582-1016 <br /> FROM: Terri Jorgenson I City of Everett Engineering/Permit Services,TJorgenson@everettwa.gov <br /> DATE: 12/2/2022 <br /> SUBJECT: Plan Review Comments for Public Works Permit Application <br /> ROPOSAL: Site Work for New SFR <br /> LOCATION: 1815 Holbrook Ave <br /> PERMIT#: PW2211-0011sY Review <br /> A review of this project by the Engineering/Permit Services Division indicates that the following revisions should be made and/or the following conditions <br /> must be met: <br /> Please see the compiled list of comments and redlines below to revise your plans accordingly, prior to resubmitting to Permit Services. Please respond to <br /> comments in the table's response column provided. Redlines are provided in a separate document. If you have any questions regarding the <br /> comments/redlines or need anything further, please directly contact this project's Public Works reviewer,Terri Jorgenson, at TJorgenson@everettwa.gov. <br /> Please note that these comments are compiled from Public Works reviewers for the Public Works (civil) plans only. The applicant team may receive a <br /> separate comment letter from the Planning Reviewer for comments related to this construction permit, or from the Building Reviewer for architectural, <br /> structural, or other types of drawings. <br /> .esubmittal: Please send your electronic resubmittal to TJorgenson(a)everettwa.gov (email with a downloadable link to the electronic files. For more <br /> instructions, see our permit application submittal & re-submittal Instructions (PDF). Lobby hours are Monday through Friday from 7:30am — 3:00pm. <br /> Required resubmittal items are as outlined below: <br /> i. Transmittal Sheet: (1) available at the Permit Services Lobby or online here: Transmittal sheet(PDF)for your use upon resubmittal. <br /> ii. Plans: Revised Civil Plans- latest civil design responding to these comments plus land use conditions. <br /> iii. SWPPP: Revised SWPPP report. <br /> iv. Drainage Report: Revised Drainage Report using the Small Project Stormwater Report Template for Separated Area (PDF). <br />