Laserfiche WebLink
June 9,2022 <br /> Page to of 15 <br /> Geotechnical Evaluation <br /> Wall Design Criteria <br /> "At-rest"Conditions(Lateral Earth Pressure—EFD') 55 pcf(Equivalent Fluid Density) <br /> "Active"Conditions(Lateral Earth Pressure—EFD') 35 pcf(Equivalent Fluid Density) <br /> Seismic Increase for "At-rest" Conditions 21H* (Uniform Distribution) 1 in 2,50o year <br /> (Lateral Earth Pressure) event <br /> Seismic Increase for "At-rest" Conditions 14H*(Uniform Distribution)1 in 50o year event <br /> (Lateral Earth Pressure) <br /> Seismic Increase for "Active" Conditions 7H*(Uniform Distribution) <br /> (Lateral Earth Pressure) <br /> Passive Earth Pressure on Low Side of Wall Neglect upper 2 feet,then 25o pcf EFD' <br /> (Allowable,includes F.S.=1.5) <br /> Soil-Footing Coefficient of Sliding Friction(Allowable; 0.40 <br /> includes F.S.=1.5) <br /> 'H is the height of the wall;Increase based on one in 50o year seismic event (io percent probability of being exceeded in <br /> 5o years), <br /> -,EFD—Equivalent Fluid Density <br /> The stated lateral earth pressures do not include the effects of hydrostatic pressure generated by <br /> water accumulation behind the retaining walls. Uniform horizontal lateral active and at-rest <br /> pressures on the retaining walls from vertical surcharges behind the wall may be calculated using <br /> active and at-rest lateral earth pressure coefficients of o.3 and o.5,respectively. A soil unit weight <br /> of 125 pcf may be used to calculate vertical earth surcharges. <br /> To reduce the potential for the buildup of water pressure against the walls, continuous footing <br /> drains (with cleanouts) should be provided at the bases of the walls. The footing drains should <br /> consist of a minimum 4-inch diameter perforated pipe, sloped to drain, with perforations placed <br /> down and enveloped by a minimum 6 inches of pea gravel in all directions. <br /> The backfill adjacent to and extending a lateral distance behind the walls at least 2 feet should <br /> consist of free-draining granular material. All free draining backfill should contain less than 3 <br /> percent fines (passing the U.S. Standard No. 200 Sieve)based upon the fraction passing the U.S. <br /> Standard No. 4 Sieve with at least 3o percent of the material being retained on the U.S. Standard <br /> No. 4 Sieve. The primary purpose of the free-draining material is the reduction of hydrostatic <br /> pressure. Some potential for the moisture to contact the back face of the wall may exist,even with <br /> treatment, which may require that more extensive waterproofing be specified for walls, which <br /> require interior moisture sensitive finishes. <br /> We recommend that the backfill be compacted to at least 90 percent of the maximum dry density <br /> based on ASTM Test Method D1557. In place density tests should be performed to verify <br /> adequate compaction. Soil compactors place transient surcharges on :he backfill. Consequently, <br /> only light hand operated equipment is recommended within 3 feet of AN so that excessive stress <br /> is not imposed on the walls. <br /> www.cobaltgeo.com (206)331-1097 <br />