My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1815 HOLBROOK AVE Geotech Report 2025-03-06
>
Address Records
>
HOLBROOK AVE
>
1815
>
Geotech Report
>
1815 HOLBROOK AVE Geotech Report 2025-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 3:27:03 PM
Creation date
3/6/2025 3:25:46 PM
Metadata
Fields
Template:
Address Document
Street Name
HOLBROOK AVE
Street Number
1815
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 9,2022 <br /> Page 8 of i5 <br /> Geotechnical Evaluation <br /> Site Preparation <br /> Trees, shrubs and other vegetation should be removed prior to stripping of surficial organic-rich <br /> soil and fill. Based on observations from the site investigation program, it is anticipated that the <br /> stripping depth will be 6 to 18 inches. Deeper excavations may be required below foundation <br /> systems and large trees,where roots extend to greater depths. <br /> The near surface soils include silty-sand with gravel and poorly graded sand trace gravel some silt. <br /> These soils are generally suitable for use as structural fill provided they meet compaction <br /> requirements and are within the 3 percent of the optimum moisture content. <br /> Imported structural fill should consist of a sand and gravel mixture with a maximum grain size of <br /> 3 inches and less than 5 percent fines (material passing the U.S. Standard No. 200 Sieve). <br /> Structural fill should be placed in maximum lift thicknesses of 12 inches and should be compacted <br /> to a minimum of 95 percent of the modified proctor maximum dry density, as determined by the <br /> ASTM D 1557 test method. <br /> Temporary Excavations <br /> Based on our understanding of the project,we anticipate that the grading could include local cuts <br /> on the order of approximately 9 feet or less for foundation and most of the utility placement. <br /> Temporary excavations should be sloped no steeper than 1.5H:1V (Horizontal:Vertical) in loose <br /> fill and native soils and iH:1V in medium dense native soils. If an excavation is subject to heavy <br /> vibration or surcharge loads, we recommend that the excavations be sloped no steeper than <br /> 2H:1V,where room permits. <br /> Temporary cuts should be in accordance with the Washington Administrative Code (WAC) Part <br /> N, Excavation,Trenching,and Shoring. Temporary slopes should be visually inspected daily by a <br /> qualified person during construction activities and the inspections should be documented in daily <br /> reports. The contractor is responsible for maintaining the stability of the temporary cut slopes <br /> and reducing slope erosion during construction. <br /> Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather, <br /> and the slopes should be closely monitored until the permanent retaining systems or slope <br /> configurations are complete. Materials should not be stored or equipment operated within 10 feet <br /> of the top of any temporary cut slope. <br /> Soil conditions may not be completely known from the geotechnical investigation. In the case of <br /> temporary cuts,the existing soil conditions may not be completely revealed until the excavation <br /> work exposes the soil. Typically, as excavation work progresses the maximum inclination of <br /> temporary slopes will need to be re-evaluated by the geotechnical engineer so that supplemental <br /> recommendations can be made. Soil and groundwater conditions can be highly variable. <br /> Scheduling for soil work will need to be adjustable,to deal with unanticipated conditions, so that <br /> the project can proceed and required deadlines can be met. <br /> If any variations or undesirable conditions are encountered during construction, we should be <br /> notified so that supplemental recommendations can be made. If room constraints or <br /> groundwater conditions do not permit temporary slopes to be cut to the maximum angles allowed <br /> by the WAC, temporary shoring systems may be required. The contractor should be responsible <br /> for developing temporary shoring systems, if needed. We recommend that Cobalt Geosciences <br /> and the project structural engineer review temporary shoring designs prior to installation, to <br /> verify the suitability of the proposed systems. <br /> www.cobaltgeo.com (206)331-1097 <br />
The URL can be used to link to this page
Your browser does not support the video tag.