My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 LAUREL DR 2025-03-12
>
Address Records
>
LAUREL DR
>
505
>
505 LAUREL DR 2025-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 8:17:51 AM
Creation date
3/7/2025 8:48:49 AM
Metadata
Fields
Template:
Address Document
Street Name
LAUREL DR
Street Number
505
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 4. COMPLETE MINIMUM REQUIREMENTS <br />The more information provided in these subsections typically corresponds to faster review and permit <br />issuance times. Submitted checklists that lack the necessary information for review are considered <br />incomplete and will be returned unprocessed to the applicant. <br />Preparation of Stormwater Site Plan <br />The purpose of this task is to convey all relevant information about the proposed project to the City for review <br />to ensure the project is in compliance with the current City and State stormwater management standards. <br />This is your opportunity to inform the reviewer about the project fundamentals as well as highlight the <br />significant and insignificant aspects of the project with regards to stormwater management. <br />0 61 <br />Task 1: Describe existing site conditions <br />Provide description of existing site conditions: <br />Grass and concrete patio <br />Describe existing structures (location, type): <br />SF Residence <br />Describe slopes on your site (flat, rolling, steep, <br />slope <br />Describe hard surfaces (roof, ground treatment): <br />roof, concrete patios <br />Describe vegetative surfaces (location, quantity ft2): <br />grass and landscape <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in 6 <br />the Combined Sewer Area -April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.