Laserfiche WebLink
STEP 4. COMPLETE MINIMUM REQUIREMENTS <br />The more information provided in these subsections typically corresponds to faster review and permit <br />issuance times. Submitted checklists that lack the necessary information for review are considered <br />incomplete and will be returned unprocessed to the applicant. <br />Preparation of Stormwater Site Plan <br />The purpose of this task is to convey all relevant information about the proposed project to the City for review <br />to ensure the project is in compliance with the current City and State stormwater management standards. <br />This is your opportunity to inform the reviewer about the project fundamentals as well as highlight the <br />significant and insignificant aspects of the project with regards to stormwater management. <br />0 61 <br />Task 1: Describe existing site conditions <br />Provide description of existing site conditions: <br />Grass and concrete patio <br />Describe existing structures (location, type): <br />SF Residence <br />Describe slopes on your site (flat, rolling, steep, <br />slope <br />Describe hard surfaces (roof, ground treatment): <br />roof, concrete patios <br />Describe vegetative surfaces (location, quantity ft2): <br />grass and landscape <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in 6 <br />the Combined Sewer Area -April 2021 <br />