My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 8:59:13 AM
Creation date
3/7/2025 2:47:49 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAISER PERMANENTE Site Prep #1 Electrical Service <br />ASC & Clinic (HUB) March 18, 2020 <br />Everett, WA Project No. 19.05002.00 <br />G. Current Transmitters (split -core): Designed for three phase or single phase installations <br />to convert monitored AC current to a proportional DC voltage of 0-10 VDC,4-20 mA <br />output or connected to DDC Network. Transmitter shall be selected based on maximum <br />primary current, voltage and size of conductor. Minimum 2,000 VAC internal isolation <br />and 600 VAC case insulation. Accuracy +/-1-percent of full scale. Complete with LED <br />indicator for normal and fault status. Repeatability plus or minus 2-percent of full scale. <br />Response time 100 milliseconds. Each phase shall be monitored for Equipment Energy <br />consumption (kWh) or demand (kW) metering. <br />H. Current Sensing Relay: 100-percent solid state with adjustable range (+/- 1-percent of <br />range) trip set point to monitor AC current. Provide with contact transfer with no <br />calibration drift, complete with LED status indicator. Limit off -state leakage to 2 mA or <br />less. Rating (200 ampere minimum) shall exceed equipment being monitored. <br />I. Control Relays: Relays shall be rated for the application, with a minimum of two sets of <br />Form C contacts, enclosed in a dustproof enclosure. Relays shall be rated for a <br />minimum life of one million operations. Operating time shall be 20 milliseconds or less, <br />with release time of 10 milliseconds or less. Relays should be equipped with coil <br />transient suppression devices to limit transients to 150 percent of rated coil voltage. <br />J. Contactors: Single coil electrically operated. Contacts shall be double break silver to <br />silver. Number of contacts and rating shall be selected for the application intended. <br />Operating and release times shall be 100 milliseconds or less. Contactors shall be <br />equipped with coil transient suppression devices to limit transients to 150 percent of rated <br />coil voltage. <br />K. Nameplates: Nameplates shall be in accordance with Division 23 Section "Identification <br />for Mechanical Piping and Equipment." <br />L. Carbon Dioxide (Air Quality) Sensors: 0-2,000 ppm, Carbon Dioxide CO2 sensors (wall <br />mounted) with integral transducers and LCD display. Output signal shall be 4 to 20 mA or <br />0-10 VDC. Accuracy shall be <+1 ppm, +2-percent of measure value. Calibration shall <br />not be required for a minimum of 5-years. <br />M. Nitrogen Dioxide (Air Quality) Sensors: 0-100 ppm, Carbon Dioxide NO2 sensors (wall <br />mounted) with integral transducers and LCD display. Output signal shall be 4 to 20 mA or <br />0-10 VDC. Accuracy shall be <+0.1 ppm, +2-percent of measure value. Calibration shall <br />not be required for a minimum of 5-years. <br />2.6 FIRE ALARM SYSTEM INTERFACE <br />A. Fire Alarm System Interface: Fire alarm system and air handling equipment smoke <br />detectors shall be provided under Division 26. Provide all hardware, software and wiring <br />required for DDC system interface. Coordinate DDC requirements with Fire Alarm <br />System Contractor. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Prior to starting work, carefully inspect installed work of other trades and verify that such <br />work is complete to the point where work of this Section may properly commence. <br />B. Notify the Owner Representative in writing of conditions detrimental to the proper and <br />timely completion of the work. <br />INSTRUMENTATION AND CONTROLS FOR HVAC 23 09 00 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.