My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 8:59:13 AM
Creation date
3/7/2025 2:47:49 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAISER PERMANENTE <br />ASC & Clinic (HUB) <br />Everett, WA <br />Site Prep #1 Electrical Service <br />March 18, 2020 <br />Proiect No. 19.05002.00 <br />provisions (wiring, installation, and materials) for all components furnished under this <br />section shall be included. Coordinate all work with Electrical Contractor. <br />D. Plenum Cable: Plenum cable type, installation methods and use shall be subject to City <br />and State Codes and Regulations. Within ceiling space, attach directly to wall or slab on <br />4-foot centers, or support from ceiling suspension wires on 4-foot centers. Do not attach <br />cables to pipes or ducts, or lay on ceilings. Cables shall be routed as high as possible <br />without interference to equipment, ceiling, lighting access and removal. <br />E. Instrumentation and communication cable shall not be run together in the same conduit <br />or raceway as power wiring. <br />F. Provide Surge and transient protection consisting of devices installed externally to digital <br />controllers and operator workstations. <br />G. Communication Cable: Provide all communication wiring between operator workstation <br />and Advanced DDC panels, between Advanced DDC panels and application specific <br />controllers and VAV digital controllers. All communication cable shall be checked for <br />continuity, grounding, and shielding. <br />H. Network Communications: Coordinate with Owner for Internet, Ethernet availability, <br />connection regulations and restrictions. <br />I. Grounding: Ground controllers and cabinets to a good earth ground. Grounding of the <br />green AC ground wire, at the breaker panel, alone is not adequate. Run metal conduit <br />from controller panels to adequate building grounds. Ground sensor drain wire shields at <br />controller end. All associated ground loop problems shall be corrected. <br />J. Provide interface control wiring for equipment with remote sensors, panels, limits, and <br />components, etc., furnished (shipped loose) by the manufacturer and to be field installed. <br />Materials, wiring and termination shall be provided and installed in accordance with <br />manufacturer's instruction, including , but not limited to the following: <br />1. Chillers: Flow switches, differential pressure and temperature sensors. <br />2. Humidifiers: Remote and High limit sensors. <br />3. Boilers: Temperature and pressure sensors, remote control panel, control valves <br />and pump interlock. <br />4. Kitchen Hood: Temperature sensors, filter switches, remote control panel. <br />5. Cooling Towers: Sump heater temperature sensor, level and vibration switches, <br />and controls. <br />6. Pumping Package: Flow sensors, temperature and differential pressure sensors. <br />7. Indoor/Outdoor Split Unit: Temperature, humidity controllers and <br />Evaporation/condenser sections. <br />8. AC Unit: Temperature, humidity controllers and control panels. <br />3.5 DDC POINT SUMMARY <br />A. Provide all Database generation. <br />B. Dynamic Color Display: Provide all dynamic graphic displays at each operator <br />workstation System graphical displays shall be color -coded. Include outside air <br />temperature indication on each primary air and water systems displays. As a minimum, <br />the following shall be provided: <br />1. Site Plan: Overall site plan, including all associated buildings. <br />2. Building Floor Plan: Each floor plan graphic shall contain all graphical displays, <br />equipment with area served, and locations associated with that building floor <br />plan. <br />3. Detailed Dynamic Color and data system graphics shall be provided for each <br />piece of mechanical equipment including, but not limited to, [air][ and ][water] <br />INSTRUMENTATION AND CONTROLS FOR HVAC 23 09 00 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.