Laserfiche WebLink
Intake & Approval Sheet (FOR PERMIT STAFF ONLY) <br />PERMIT # MI00 ✓ /0800 <br />BUILDING <br />Intake OK by: Date: <br />Intake Comments: <br />❑ Route to Commercial Building <br />❑ Route to Residential Building <br />❑ Make this a "W" Permit <br />Bldg/TI/Addn/Rem Size <br />Garage/Accessory Struct. Size <br />Number of Stories <br />Basement <br />❑No ❑Yes , Fin / Unfin <br />Type of Construction <br />Occupancy Group <br />Occupancy Load <br />Fire Sprinklers: El Update Existing ❑New System ❑Not Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: El Update Existing El New System El Not Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No <br />Add'I RCW 64.55 docs required prior to final? ❑Yes ❑No <br />VALUATION CALCULATION: Total $ <br />Additional Notes: <br />Approved By: Date: �v 202A <br />FIRE DEPARTMENT <br />Separate / Deferred Submittals Required: <br />❑Fire Sprinklers ❑Fire Alarm ❑Other: <br />Additional Notes: <br />Iyw &4A).— <br />Fire 134t. Fees: <br />Review of As -Built Plans - NO FIRE FEE <br />❑ Minimal or No Fire Scope - NO FIRE FEE <br />GT-Review / Inspection Scope - ADD FIRE FEE <br />pproved By: Date: <br />EL ICA <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake O by: ,, sign To: Date: <br />Intake Co ments: <br />❑ Attach to Project No. <br />❑ Route to Historic Reviewer <br />❑ OK to Route to Other Departments <br />❑ Hold in Planning File Drawer <br />Zone <br />Overlay/Agreement <br />Nonresidential Use <br />Residential Use <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />Planning/Landscape Inspection Required before Final? ❑Yes []No <br />"In Lieu" Fee: Type: Amount $ <br />School Impact Fee: Total $ <br />Calculated: Credit: <br />El Everett School Dist ❑Mukilteo School Dist <br />Additional Notes: <br />Approved By: <br />Date: <br />PUBLIC WORKS <br />Intake OK by:Date: <br />................. ......._...._.......... <br />............. <br />Intake Comments: ;PW Worksheet Needed if., <br />[]Sys Dev Eval ❑Traffic Mlt Eval <br />❑Site Work or Drainage Proposed <br />❑Backflow Prevention for high hazard: <br />;(dental, medical, animals, mortuary, hospital, <br />!supportive housing) <br />......................................................._........................... <br />El Route this folder for PW Review at end ---p..... <br />W Review Worksheet <br />❑This project also has a separate concurrent PW Review (Green Folder) <br />ND ❑Create Green Folder []Submitted Previously ❑Deferred <br />This Permit is Approved by Public Works <br />❑ See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder 0oin with this folder for permit issuance) <br />❑ WIII be Issued separately (Separate Green Folder, PW issued ahead of Bldg) <br />Public Works has no scop -- PW Not Required <br />Additional Notes: <br />Approved By: Date: <br />