My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 8:59:13 AM
Creation date
3/7/2025 2:47:49 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAISER PERMANENTE <br />ASC & Clinic (HUB) <br />Everett, WA <br />SECTION 07 84 13 - PENETRATION FIRESTOPPING <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />Site Prep #1 Electrical Service <br />March 18, 2020 <br />Proiect No. 19.05002.00 <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section Includes: <br />1. Penetrations in fire -resistance -rated walls. <br />2. Penetrations in horizontal assemblies. <br />3. Penetrations at doors and frames. <br />B. Related Requirements: <br />1. Division 07 Section "Joint Firestopping" for joints in or between fire -resistance - <br />rated construction, at exterior curtain-wall/floor intersections, and in smoke <br />barriers. <br />1.3 PREINSTALLATION MEETINGS <br />A. Preinstallation Conference: Conduct conference at Project site. <br />1.4 ACTION SUBMITTALS <br />A. Product Data: For each type of product. <br />B. Sustainable Design Submittals: <br />1. Product Data: For sealants, indicating VOC content. <br />C. Product Schedule: For each penetration firestopping system. Include location, illustration <br />of firestopping system, and design designation of qualified testing and inspecting agency. <br />1. Engineering Judgments: Where Project conditions require modification to a <br />qualified testing and inspecting agency's illustration for a particular penetration <br />firestopping system, submit illustration, with modifications marked, approved by <br />penetration firestopping system manufacturer's fire -protection engineer as an <br />engineering judgment or equivalent fire -resistance -rated assembly. Obtain <br />approval of authorities having jurisdiction prior to submittal. <br />1.5 INFORMATIONAL SUBMITTALS <br />A. Qualification Data: For Installer. <br />B. Product Test Reports: For each penetration firestopping system, for tests performed by a <br />qualified testing agency. <br />PENETRATION FIRESTOPPING 078413 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.